Umrangso

Umrangso
উমৰাংছ'
Umrongso
Town

Main Square, Neepco Colony, Umrangso
Umrangso
Umrangso

Location in Assam, India

Coordinates: 25°30′49″N 92°44′13″E / 25.51357°N 92.73704°E / 25.51357; 92.73704Coordinates: 25°30′49″N 92°44′13″E / 25.51357°N 92.73704°E / 25.51357; 92.73704
Country  India
State Assam
District Dima Hasao
Area
  Total 3.98 km2 (1.54 sq mi)
Elevation 640 m (2,100 ft)
Population (2001)
  Total 9,024
  Density 2,300/km2 (5,900/sq mi)
Languages
  Official Assamese
  Others Dimasa, Karbi, Hmar, Rengma Naga, Halflong Hindi
Time zone IST (UTC+5:30)
PIN 788931
Telephone code 03670
Vehicle registration AS
Sex ratio 0.8245 /

Umrangso (Pron: ʊˈmrʌŋˌsəʊ) is an industrial town and a town area committee in Dima Hasao district in the state of Assam, India. It is located at the border of Assam and Meghalaya states some 112 km from Haflong, the district headquarters of Dima Hasao district of Assam.

The region has been deeply affected by factional violence involving several armed insurgent groups fighting among themselves and with the Indian Security Forces. Since 2011 there has been a decrease in violence following arrests of several high-ranking insurgent leaders and a cease-fire agreement with the Indian Government.[1]

Khandong Dam
Vivekananda Kendra Vidyalaya
The Umrangso Reservoir

Major Industries

NEEPCO - Kopili Hydro Electric Project

A government of India enterprise, located in the Dima Hasao district (formerly known as North Cachar Hills district) near the Assam-Meghalaya border, the hot spring of Garampani is now lost in the dammed water of Kopili river after completion of Kopili Hydro Electric Project.[2] The Kopili Hydro Electric Project was the maiden venture of NEEPCO when it came into existence in 1976.

Khandong and Kopili Power Station
The first stage of Kopili Hydro Electric Plant has two dam and dyke systems which created two reservoirs, one on the Kopili River and the other on the Umrong stream, a tributary of the Kopili. Water from the Kopili reservoir is used in the Khandong power station through a 2759 metre tunnel to generate 50 MW (2 × 25 MW) of power. The tail water from this powerhouse is led to the Umrong reservoir. The water from Umrong reservoir is taken through a 5473 metre tunnel to the Kopili power station to generate 200 MW (4 × 50 MW) of power.
The first stage extension of the plant envisaged setting up two additional 50 MW units at Kopili power station, provisions for which were already kept during the first stage development of the project. The Units III and IV under this extension scheme were commissioned in March 1997 and June 1997 respectively. The total installed capacity of the Kopili power station thus went up to 200 MW and that of the project as whole to 275 MW. The Umrong reservoir was raised by 7.6 m to meet the demand for more water for two additional 50 MW units of first stage extension.
KHEP Stage II power station
The second stage of the Kopili Hydro Electric Plant involves a powerhouse to generate additional 25 MW of power by using water from the Khandong reservoir through a 481 metre long water conductor system, provision of which was kept as a bypass conduit from the surge shaft in the Khandong tunnel. The water from the second stage powerhouse will go to the Umrong reservoir for use in the Kopili power station.

Cement Industry

Vinay Cements was set up in 1989 at a capital cost of ₹270 million. At the time of commissioning, it was one of the largest private sector investments in the North-East region. The plant uses rotary technology with a four stage pre-heater and fourth generation grate cooler with current installed capacity of 0.24 million tons per annum. In its category, it has consistently been among the top three manufacturers of cement since its inception. In 2004 it became a 100% debt-free company. In 2006–2007 it has reported revenues of ₹488 million and an earnings before interest, taxes, depreciation and amortization (EBIDTA) of ₹117 million. With a view to consolidate the group companies and provide greater shareholder value, it has recently initiated the process of acquiring RCL Cement in an all-stock deal.[3]

Residents in the area claim that the presence of these cement factories has led to chronic air pollution.[4]

Demographics

As of 2011 India census,[5] Umrangso had a population of 10,376. Males constitute 55% of the population and females 45%. Umrangso has an average literacy rate of 74%, higher than the national average of 59.5%: male literacy is 79%, and female literacy is 69%, 14% of the population is under 6 years of age.Some of the ethnicities in the town are - Dimasas, Karbies, Jaintias (pnars),Hmar, Nepali, Bengali, Bihari etc.

Education institutions

Vivekananda Kendra Vidyalaya, Umrangso[6] (one of the schools in Vivekananda Kendra Vidyalaya system), Garampami High School, Smt. Jamuna Devi Saraswati Vidya Mandir and Sacred Heart Convent School are the three kindergarten through higher secondary schools in the town. J. B. Hagjer College (affiliated to Assam University, Silchar) is the sole university level educational institution in town.

References

  1. Times Syndication Service. "Dima Hasao District Profile". The Times of India. New Delhi, India.
  2. Official Website. "NEEPCO". NEEPCO, A Govt. of India Enterprise.
  3. Official Website. "Vinay Cements". Vinay Cements.
  4. Biswas, Anup (6 December 2010). "Plight of Umrangso people remains unheard". Assam Times.
  5. "Umrangso Circle - Dima Hasao". Census Organization of India.
  6. "Vivekananda Kendra Vidyalaya, Umrangso". Vivekananda Kendra Siksha Prashar Vibhag.
This article is issued from Wikipedia - version of the 9/15/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.