Stadium MRT Station

Coordinates: 01°18′10.0″N 103°52′31.3″E / 1.302778°N 103.875361°E / 1.302778; 103.875361

 CC6 
Stadium
体育场
ஸ்டேடியம்
Stadium
Rapid transit

Platform level of Stadium MRT station.
Location 3 Stadium Walk
Singapore 397692
Coordinates 1°18′10″N 103°52′31″E / 1.302856°N 103.875306°E / 1.302856; 103.875306
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 2
Disabled access Yes
Other information
Station code  CC6 
History
Opened 17 April 2010
Electrified Yes
Previous names Boulevard
Services
Preceding station   Mass Rapid Transit   Following station
towards Dhoby Ghaut
Circle Line
towards HarbourFront
TerminusCircle Line
Stadium Shuttle
towards Marina Bay
Location

Stadium MRT Station (CC6) is an underground Mass Rapid Transit station on the Circle Line in Kallang, Singapore. The station was opened on 17 April 2010 along with the rest of Stages 1 & 2 of the Circle Line.

It serves the Singapore Sports Hub (which comprises the new National Stadium, the new Aquatic Centre, the new Kallang Wave Mall and the existing Singapore Indoor Stadium), Leisure Park Kallang and the Tanjong Rhu area. The station is named after the sport centres/stadiums in the vicinity. It is expected to have a high amount of passenger usage when there is a significant event in the Sport centres nearby. The station was designed by WOHA Architects that was awarded with the Design Of The Year of the President's Design Award 2010 for the station's design.[1] This station is also within the vicinity of Kallang and Mountbatten stations.

Since the opening of the Circle Line extension on 14 January 2012, trains from Marina Bay terminate at Platform A of this station during off-peak hours, proceed to perform a cross-over after the station and arrive at Platform B to return to Marina Bay.


Exits

Station layout

L1 Street Level Faregates, Ticketing Machines, Station Control, Transitlink Counter
Exits to Singapore Sports Hub, Singapore Indoor Stadium
B1 Service Level Restricted Access
B2 Platform A Circle Line towards  CC29  NE1  HarbourFront via  CC7  Mountbatten (→)

Terminus for  CE2  NS27  Marina Bay trains

Island platform, doors will open on the right
Platform B Circle Line towards  CC1  NS24  NE6  Dhoby Ghaut or  CE2  NS27  Marina Bay via  CC5  Nicoll Highway (←)

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
Circle Line
to CC1 Dhoby Ghaut 5.45am 6.13am 11.54pm
to CC29 HarbourFront 5.47am 6.15am 10.58pm
to CC26 Pasir Panjang 11.28pm
to CC23 one-north 11.44pm
to CC17 Caldecott 12.12am
to CC11 Tai Seng 12.20am

References

  1. "President's Design Award 2010". DesignSingapore Council. Retrieved 3 September 2013.
Wikimedia Commons has media related to Stadium MRT Station.
This article is issued from Wikipedia - version of the 8/20/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.