Marymount MRT Station
CC16 Marymount 玛丽蒙 மேரிமவுண்ட் Marymount | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Exit B of Marymount MRT station. | |||||||||||
Location |
60 Marymount Road Singapore 573993 | ||||||||||
Coordinates | 1°20′57″N 103°50′22″E / 1.349078°N 103.839492°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 2 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | CC16 | ||||||||||
History | |||||||||||
Opened | 28 May 2009 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Marymount MRT Station (CC16) is an underground Mass Rapid Transit station on the Circle Line in Bishan, Singapore.
There are two exits and entry points to the station, one of which serves Shunfu Estate while the other is located near the western end of Raffles Institution. The station was opened on 28 May 2009 along with the rest of Stage 3 of the Circle Line due to the result of the Nicoll Highway collapse on 20 April 2004.[1]
History
This station was the terminal for the Circle Line until the opening of the HarbourFront wing of the Circle Line on 8 October 2011 when all the MRT stations along the Circle line became operational to commemorate its operator, SMRT Trains' 24th Anniversary since its inauguration in 1987. Before the future Upper Thomson opens in 2020, this station is the nearest MRT station within the Thomson area.
Art in Transit
In this station's Art in Transit, Joshua Yang's artwork Superstring consists of individual pieces constructed with only one continuous line that winds around itself to let the viewer explore real and virtual spaces.
Station layout
L1 | Street Level | |
B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter |
B2 | Platform A | Circle Line towards CC29 NE1 HarbourFront via CC17 TE9 Caldecott (→) |
Island platform, doors will open on the right | ||
Platform B | Circle Line towards CC1 NS24 NE6 Dhoby Ghaut via CC15 NS17 Bishan (←) |
Exits
- A: Marymount Road (North)
- B: Marymount Road (South)
Transport connections
Rail
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
Circle Line | ||||||
to CC1 Dhoby Ghaut | 5.37am | 6.04am | 11.32pm | |||
to CC29 HarbourFront | 5.25am | 5.50am | 11.20pm | |||
to CC26 Pasir Panjang | – | – | 11.50pm | |||
to CC23 one-north | – | – | 12.06am | |||
to CC7 Mountbatten | – | – | 12.09am | |||
to CC12 Bartley | – | – | 12.33am | |||
to CC17 Caldecott | – | – | 12.34am |
References
- ↑ "Circle Line to open two days ahead of schedule, fares identical to NEL". Channel NewsAsia. 2009-04-16.