Line 5, Fuzhou Metro

Line 5, Fuzhou Metro
Overview
Type Rapid transit
System Fuzhou Metro
Status Planned
Locale Fuzhou, China
Termini Fuzhou South Railway Station
Pujue Temple
Stations 20
Services 1
Operation
Opened 2022
Owner City of Fuzhou
Operator(s) Fuzhou Metro Co., Ltd.
Character Underground
Technical
Line length 24.5 km (15.22 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC
Route map
Template:FZM RDT/5

Line 5 of the Fuzhou Metro (Chinese: 福州地铁5号线; pinyin: Fúzhōu Dìtiě Wǔ Hào Xiàn) or Yanjiang Line (Chinese: 沿江线; pinyin: Yán Jiāng Xiàn) runs from Cangshan District to Cangshan District. It starts at Fuzhou South Railway Station and ends at Pujue Temple. The total length is 24.5 km. Line 5's color is light blue. This line is scheduled to begin the construction in 2018 and end in 2022.

Stations

This article is issued from Wikipedia - version of the 10/10/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.