Line 4, Fuzhou Metro
Line 4, Fuzhou Metro | |||
---|---|---|---|
Overview | |||
Type | Rapid transit | ||
System | Fuzhou Metro | ||
Status | Planned | ||
Locale | Fuzhou, China | ||
Termini |
Hongtang Luozhou | ||
Stations | 21 | ||
Services | 1 | ||
Operation | |||
Opened | 2023 (scheduled) | ||
Owner | City of Fuzhou | ||
Operator(s) | Fuzhou Metro Co., Ltd. | ||
Character | Underground | ||
Technical | |||
Line length | 24.2 km (15.04 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | Third rail, 1,500 V DC | ||
|
Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Hongtang and ends at Luozhou. The total length is 24.2 km. Line 4's color is orange. This line is scheduled to begin the construction in 2019 and ends in 2023.
Stations
- Luozhou (Transfer Line 5)
- Chengmen (Transfer Line 1)
- Qianjiangcun (There is a Jinjizhui Depot)
- Exhibition Center (Transfer Line 6)
- Puxia
- Jiangbiancun
- Aofeng Road
- Yuanyang Road
- Qianyu (Transfer Line 2)
- Fuxin East road
- Huagong Road
- Chibian
- Yuefeng Town North
- Tatou
- Shengli Hospetal
- Dongjiekou
- Baima North Road
- West No.2 ring Road
- The North gate of Fuzhou University
- Yangqiao West Road
- Luozhou (Transfer Line 5, There is a Hongtang Parking.)
This article is issued from Wikipedia - version of the 7/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.