Line 4, Fuzhou Metro

Line 4, Fuzhou Metro
Overview
Type Rapid transit
System Fuzhou Metro
Status Planned
Locale Fuzhou, China
Termini Hongtang
Luozhou
Stations 21
Services 1
Operation
Opened 2023 (scheduled)
Owner City of Fuzhou
Operator(s) Fuzhou Metro Co., Ltd.
Character Underground
Technical
Line length 24.2 km (15.04 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC
Route map
Template:FZM RDT/4

Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Hongtang and ends at Luozhou. The total length is 24.2 km. Line 4's color is orange. This line is scheduled to begin the construction in 2019 and ends in 2023.

Stations

This article is issued from Wikipedia - version of the 7/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.