2nd & Pine

2nd & Pine

Under construction in April 2016
General information
Status Under construction
Type Residential
Address 204 Pine Street
Seattle, Washington
Coordinates 47°36′38.38″N 122°20′22.95″W / 47.6106611°N 122.3397083°W / 47.6106611; -122.3397083Coordinates: 47°36′38.38″N 122°20′22.95″W / 47.6106611°N 122.3397083°W / 47.6106611; -122.3397083
Construction started 2014
Estimated completion 2017
Height 440 feet (130 m)
Technical details
Floor count 40
Design and construction
Architecture firm Weber Thompson
GBD Architects
Developer Equity Residential
Structural engineer Magnusson Klemencic Associates
Other information
Number of units 398 apartments
Parking 217 parking stalls
References
[1]

2nd & Pine is a residential skyscraper in downtown Seattle, Washington, that is currently under construction. When completed in 2017, the 40-story tower will be 440 feet (130 m) tall have 398 luxury apartments.[1] Plans for the project were first proposed in 2013 and construction began in late 2014.[2] It is located at the intersection of 2nd Avenue and Pine Street near the Pike Place Market and the city's retail core.

Architects Weber Thompson and GBD Architects, working on the project in a joint venture, described the tower's design as "slender and sculpted". It will sit atop a podium, housing 3,000 square feet (280 m2) of retail space, with a terra-cotta facade. The building will also include Zipcar parking spaces, electric vehicle charging stations, bicycle parking, low-energy appliances, and other environmentally-friendly features in a bid to earn a LEED rating.[2][3]

The five-story, 217-stall underground parking garage extends north from the tower's lot to a site that will be occupied by a 16-story hotel developed by Widewaters Group.[4]

History

The site at 2nd Avenue and Pine Street was originally proposed for a 23-story, $200 million mixed-use highrise developed by a consortium led by Starwood Capital Group, called "1 Hotel & Residences", with 98 luxury condominiums and a 110-room hotel as well as four floors of retail at ground level and a luxury gym.[5] The project broke ground in 2007 and was expected to be completed in 2009,[6] but construction was halted in September 2007 because of the then-ongoing financial crisis, and designs were revised to eliminate over 100 proposed condominium units after only 20 of them had been sold.[7] Paul Brenneke, who had originally acquired the lot in 2000 and had been planning a project there for several years prior,[8] sold his stake in the project to Starwood in June 2008, citing the project's financial difficulties.[9] The excavated hole was later filled in 2009 and paved over with a parking lot.[10][11]

The half-block property was bought by Chicago-based Equity Residential in 2012 for $22 million,[12] and the company announced its plans for a 39-story apartment building in January 2013.[13] Construction of the building, led by Turner Construction, began in October 2014 and is anticipated to be completed in 2017.[14]

A 16-story, 229-room hotel on the north side of the lot, facing Stewart Street, will begin construction in 2016 and is scheduled to be completed in February 2018.[15]

References

  1. 1 2 2nd & Pine at Emporis
  2. 1 2 "Equity starting 40-story tower with 398 apartments on Pine". Seattle Daily Journal of Commerce. October 1, 2014. Retrieved May 9, 2016.
  3. "'Slender, sculpted' tower at 2nd & Pine". Seattle Daily Journal of Commerce. May 1, 2013. Retrieved May 9, 2016.
  4. Levy, Nat (April 14, 2015). "16-story hotel will share site with Equity's 40-story apartment tower". Seattle Daily Journal of Commerce. Retrieved May 9, 2016.
  5. Martinez, Amy (November 14, 2007). "Luxury gym Equinox takes shine to Seattle". The Seattle Times. Retrieved May 9, 2016.
  6. "Another condo project breaks ground in Seattle". Puget Sound Business Journal. June 11, 2007. Retrieved May 9, 2016.
  7. Pryne, Eric (February 29, 2008). "Downtown Seattle hotel-condo project put on hold". The Seattle Times. Retrieved May 9, 2016.
  8. Bishop, Todd (February 11, 2001). "Developer in talks with Saks on Second Ave. site". Puget Sound Business Journal. Retrieved May 9, 2016.
  9. Pryne, Eric (June 24, 2008). "Developer of stalled 1 Hotel sells out to partner Starwood". The Seattle Times. Retrieved May 9, 2016.
  10. Lang Jones, Jeanne (October 9, 2009). "Starwood says it will fill its Seattle excavation". Puget Sound Business Journal. Retrieved May 9, 2016.
  11. Pryne, Eric (October 13, 2009). "Starwood luxury hotel site becomes a parking lot — again". The Seattle Times. Retrieved May 9, 2016.
  12. Lang Jones, Jeanne (August 1, 2012). "Vacant lot next to Macy's garage in Seattle sold for $22M". Puget Sound Business Journal. Retrieved May 9, 2016.
  13. Stiles, Marc (January 24, 2013). "39-story apartment tower proposed for Second and Pine in downtown Seattle". Puget Sound Business Journal. Retrieved May 9, 2016.
  14. Stiles, Marc (September 30, 2014). "New Pike Place Market neighbor: Luxury 40-story apartment building breaks ground". Puget Sound Business Journal. Retrieved May 9, 2016.
  15. "Skanska starting hotel at Second and Stewart". Seattle Daily Journal of Commerce. September 2, 2016. Retrieved September 2, 2016.

External links


This article is issued from Wikipedia - version of the 9/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.