Zhengzhou–Kaifeng Intercity Railway
Zhengzhou–Kaifeng Intercity Railway 鄭開城際鐵路 | |
---|---|
Overview | |
Status |
Songchenglu–Kaifeng |
Locale |
Zhengzhou Kaifeng |
Termini |
Zhengzhou East Kaifeng |
Services | 1 |
Operation | |
Opened |
Zhengzhou–Songchenglu |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 50.33 km (31 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 200 km/h (124 mph) |
Zhengzhou–Kaifeng ICR route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Zhengzhou–Kaifeng Intercity Railway, also known as the Zhengbian Intercity Railway, is a partially completed high-speed railway in Henan Province, China, between the cities of Zhengzhou and Kaifeng. It is a component of the larger Central Plain Metropolitan Intercity Rail network. Construction commenced on December 29, 2009. With a designed top speed of 200 km/h, it is built as a double tracked electrified passenger dedicated line. Total length of this project is 50.33 kilometers, costing an estimated 5.5 billion yuan to construct. The project has been built in two phases, Phase I (Zhengzhou East - Song Cheng Lu) was completed on December 17, 2014,[1] & Phase II (Song Cheng Road - Kaifeng station) is expected to be completed by 2017.
Route
Phase I
This phase runs from Zhengzhou East Railway Station to Songchenglu Railway Station, via Jialuhe, Luboyuan and Yulianghe. These stations are fully operational.[2] A further seven station sites are still under construction along this route at Zhongyi Xueyuan, Dayouzhuang, Yuantangshu, Dameng, Dangzhuang, Cangzhai and Bian West.
Phase II
Phase II will be extended to Kaifeng Railway Station and set aside the Huanghe Dajie Railway Station site in an extension, the program starting in 2015 and to be completed during 2017.
Apart from Zhengzhou East and Kaifeng Stations, and the rest are new station sites.
Equipment types
This railway is using CRH2A type EMU,with eight cars, each with a total capacity 613 people and running a top speed of 200 km/h.[1]
Fare structure
Fares ranges from 28 yuan for a full fare first-class seat, second-class seat is 18 yuan over the whole distance. The shortest and minimum fare is 11 yuan for a first-class seat, 7 yuan for second-class seat. The elderly, children and disabled soldiers enjoy a 30% discount.[3]
References
- 1 2 "郑开城际铁路12月28日正式开通 全程票价18元". 开封网.
- ↑ "郑开城际铁路已具备联调联试条件 计划年底开通". 东方今报. October 14, 2014.
- ↑ "郑开城铁票价确定 全程一等座28元二等座18元". 大河网. December 25, 2014.