Vale of Glamorgan Line

Vale of Glamorgan Line

A Cardiff-bound Arriva Trains Wales Class 150 passing through Aberthaw Station, which closed in 1964
Overview
Type Heavy Rail
System National Rail
Locale Cardiff
Bridgend county borough
Vale of Glamorgan
Operation
Owner Network Rail
Technical
Number of tracks Double track throughout
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge

Vale of Glamorgan Line

Valley Lines
Length or
Date closed
Cardiff Queen Street
South Wales Main Line to Newport

to Cardiff Bay
Cardiff Central
River Taff

South Wales Main Line to Bridgend
Cardiff Canton depot
City Line via Ninian Park
Grangetown
River Ely
Llandough
Cogan Junction
Penarth Dock
Dingle Road
Penarth
Cogan
Cogan Tunnel
222 yd
203 m
Eastbrook
Dinas Powys
Alberta Place Halt 6 May 1968
Lower Penarth 6 May 1954
Lavernock 6 May 1968
Swanbridge 6 May 1968
Sully 6 May 1968
Biglis Junction 6 May 1968
former main line
to Pontypridd via Wenvoe
2 Dec 1963
Cadoxton
Barry Docks
Barry Docks station
connection to Barry Tourist Railway
Barry Shed
Barry

Carriage works
Barry Island viaduct
155 yd
142 m
Barry Island
Barry Island Tunnel
280 yd
256 m
Barry Pier 5 Jul 1976
Porthkerry
No.1 Tunnel
543 yd
497 m
Porthkerry Viaduct
376 yd
344 m
Porthkerry
No.2 Tunnel
73 yd
67 m
Porthkerry Lime
& Cement Works
Rhoose Cement Works
Rhoose
for Cardiff International Airport
Aberthaw High Level 1964
Aberthaw Low Level 1 Nov 1932

Aberthaw Power Station

Aberthaw Cement Works
(Lafarge Tarmac)

former Taff Vale Railway
to Cowbridge
Gileston
St. Athan
R.A.F St. Athan
Llantwit Major
Llandow (Wick Road) Halt
Llandow Halt
Southerndown Road
Southerndown Road
Lime Works
Lancaster Quarry
Duchy Quarry
Ewenny Quarry
Ford Waterston Branch
South Wales Main Line
to Cardiff

Cowbridge Road Junction

former goods line 15 Jun 1964
Bridgend
Bridgend & Coity
(Goods)
Coity Junction

Maesteg Line to Tondu
South Wales Main Line
to Swansea

The Vale of Glamorgan Line is a Commuter rail in the United Kingdom, running through the Vale of Glamorgan in South Wales, from Cardiff to Bridgend via Barry, Rhoose and Llantwit Major. There are also branch lines to Penarth and Barry Island. In 1964, the line between Barry and Bridgend was shut by the Beeching Axe, as seen in the report 'The Reshaping of Britains Railways', but after 41 years, in 2005, the section was reopened with two new stations at Llantwit Major and Rhoose, the bay platform '1A' at Bridgend was reinstated to act as a terminus for the Vale Line. It came to the conclusion that freight trains to/from the Ford Factory in Bridgend and Aberthaw Power Station and a detour for main line trains kept the section of track from being lifted, which saved the Vale Line.

History

For more details on this topic, see Barry Railway Company.

Originally part of the Barry Railway Company, the line opened from 1885. The whole of the Barry Railway, including Barry Docks, became a constituent part of the Great Western Railway in 1923, after the railway grouping.[1] Local traffic on the line included that from the limestone quarries and the cement works at Aberthaw, and Rhoose cement works at the eastern end of the line. Wartime traffic was created from Tremains and Brackla Hill at Bridgend and the RAF base at St. Athan. More recent developments were the opening of Aberthaw power station in February 1966 and the Ford engine plant at Bridgend in January 1980.

The Barry-Bridgend passenger service finished on 13 June 1964 as part of the Beeching cuts, but passenger trains on the eastern part of the line from Cardiff-Barry continued, and the western section continued to be used by through passenger trains between Cardiff and Bridgend when the main line via Pontyclun was closed. This still frequently happens at night and on Sundays and train operators ran empty coaching stock and empty mail trains via this route to retain train crew route knowledge.

By the late 1990s, a daily train runs between Ford’s plants at Dagenham and Bridgend and merry-go-round coal trains run between Onllwyn and Cwmgwrach (to the west), Tower Colliery, Newport Docks and Avonmouth (to the east), to Aberthaw power station averaging some 10 trains a day. Rhoose cement works has closed, and a connection is retained to Aberthaw cement works where wagons are stored.

There remained a mainline connection with the heritage operation of the Barry Island Railway Centre just outside Barry Station, with the exchange available to Barry Island.

Reopening to passengers

A pressure group called Railfuture[2] produced a booklet “Rails to the Vale” in 1997 in which it was stated that they believe: that a new daily passenger service through the vale could cover its costs – and even generate profits given time

With traffic increasing to Cardiff International Airport, the Local Government transport consortium SWIFT also identified the potential for reopening the Vale of Glamorgan line. The scheme was promoted by the Vale of Glamorgan and Bridgend Borough Councils to the Welsh Assembly Government in August 1999. After agreeing funding, track upgrading and signalling works commenced in June 2004 with: 3.5 miles (5.6 km) of new track laid; 6.5 miles (10.5 km) of track upgraded; 15000 tonnes of ballast used; three new section signals (2 on the up and 1 on the down) were installed together with three distant signals and one repeater signal required by the curved approach to Llantwit Major Station. Final planning permission for the new stations and interchanges at Rhoose, Cardiff International Airport and Llantwit Major was granted in 2004 and from October 2004 the line was closed daily between Bridgend and Aberthaw or Barry for the station construction, with goods traffic passing at night. At Bridgend, the Barry bay was relaid and a new platform face built. Network Rail used three contractors: Mowlem for the permanent way; Carillion for signals and telephones; and Galliford Try for civil engineering, including the platforms. The Vale of Glamorgan Council was responsible for the construction of the interchanges at Rhoose, Cardiff International Airport and Llantwit Major. Network Rail spent £15m and the Vale of Glamorgan Council £2m making a grand total of £17m for the whole project. The daytime closures were shortened from April to enable crew training to commence.

The official opening was performed by Andrew Davies AM, Welsh Assembly Government Minister for Economic Development and Transport, on 10 June 2005. The section of line between Barry and Bridgend reopened for passenger services on 12 June, the first day of that year's Summer timetable, with a pair of Class 143's (143606 and 143624) working 0840 Cardiff-Bridgend and 0945 return. Arriva Trains Wales then ran a number of loco-hauled special services in conjunction with the Barry (waterfront) transport festival.

Operations

The line is currently operated by Arriva Trains Wales (ATW) as part of the Valley Lines network. ATW replaced the previous franchise, Wales & Borders in December 2003.

The cities, towns and villages served by the line are listed below.

Electrification of the Line

On 16 July 2012 plans to electrify the line were announced by the Government as part of a £9.4bn package of investment of the railways in England and Wales.[3]

The announcement was made as an extension of the electrification of the South Wales Main Line from Cardiff to Swansea and the electrification of the south Wales Valley Lines at a total cost of £350 million. The investment will require new trains and should result in reduced journeys times and a cheaper to maintain network. It is thought to start between 2014 and 2019.[4]

See also

References

Wikimedia Commons has media related to Vale of Glamorgan Line.
This article is issued from Wikipedia - version of the 10/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.