Tribute Power Station
Anthony Dam | |
---|---|
Location of the Anthony Dam in Tasmania | |
Country | Australia |
Location | Western Tasmania |
Coordinates | 41°51′36″S 145°37′12″E / 41.86000°S 145.62000°ECoordinates: 41°51′36″S 145°37′12″E / 41.86000°S 145.62000°E |
Purpose | Power |
Status | Operational |
Opening date | 1993 |
Owner(s) | Hydro Tasmania |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds | Anthony River |
Height | 40 metres (130 ft) |
Length | 124 metres (407 ft) |
Dam volume | 110 thousand cubic metres (3.9×10 6 cu ft) |
Spillways | 1 |
Spillway type | Uncontrolled |
Spillway capacity | 227 cubic metres per second (8,000 cu ft/s) |
Reservoir | |
Creates | Lake Plimsoll |
Total capacity | 36,180 megalitres (1,278×10 6 cu ft) |
Catchment area | 37 square kilometres (14 sq mi) |
Surface area | 38.4 hectares (95 acres) |
Power station | |
Name | Tribute Power Station |
Coordinates | 41°49′01″S 145°39′02″E / 41.81694°S 145.65056°E |
Operator(s) | Hydro Tasmania |
Commission date | 1994 |
Type | Conventional |
Hydraulic head | 271 metres (889 ft) |
Turbines |
1 x 84 MW (113,000 hp) Fuji Francis turbine |
Installed capacity | 84 megawatts (113,000 hp) |
Capacity factor | 0.9 |
Annual generation | 265 gigawatt-hours (950 TJ) |
Website hydro | |
[1] |
The Tribute Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia.
Technical details
Part of the Pieman–Anthony Power Development scheme that comprises four hydroelectric power stations, the Tribute Power Station is the first station in the scheme, being the highest upstream, yet the last major hydro-electric power development in Tasmania.[2] The power station is located underground, below the 40-metre (130 ft)-high rock-filled concrete faced Anthony Dam and the adjacent 17-metre (56 ft)-high Anthony Levee, both across the Anthony River which forms Lake Plimsoll. Water from the lake is fed to the power station via a 7-kilometre (4.3 mi) headrace tunnel.[3]
The power station was commissioned in 1994 by the Hydro Electric Corporation (TAS) and the station has one Fuji Francis turbine, with a generating capacity of 84 megawatts (113,000 hp) of electricity. The station output, estimated to be 265 gigawatt-hours (950 TJ) annually,[1] is fed to TasNetworks' transmission grid via a 13.8 kV/220 kV Fuji surface generator transformer to the outdoor switchyard.[4]
Although the Tribute Power Station might have been the last major construction project of the Hydro Electric Commission of Tasmania, the 1,000 GWH Project has resulted in upgrades to component parts of existing superstructure operated by Hydro Tasmania.[5][6][7]
See also
References
- 1 2 "Register of Large Dams in Australia" (Excel (requires download)). Dams information. Australian National Committee on Large Dams. 2010. Retrieved 23 June 2015.
- ↑ "Anthony Power Development". Australian Year Book. Australian Bureau of Statistics (87): 552. 1995.
- ↑ "Pieman". Energy. Hydro Tasmania. Retrieved 4 July 2015.
- ↑ "Tribute Power Station: Technical fact sheet" (PDF). Mersey-Forth Catchment. Hydro Tasmania. Retrieved 4 July 2015.
- ↑ "Australia utility to upgrade hydro system to add 1000 GWh". Hydroworld. 2008.
- ↑ "Carbon neutral target part response climate change" (Press release). Hydro Tasmania. May 2008.
- ↑ "Our performance". Annual Report. Hydro Tasmania. 2009. p. 2.
External links
- "Pieman Sustainability Review: Information review of the Anthony-Pieman hydropower scheme" (PDF). Hydro Tasmania. February 2015.