Springfield Central railway station

Not to be confused with Springfield railway station, Brisbane.
Springfield Central

Station front in December 2013
Location Trackstar Avenue, Springfield Central
Coordinates 27°40′27″S 152°54′10″E / 27.6743°S 152.9029°E / -27.6743; 152.9029Coordinates: 27°40′27″S 152°54′10″E / 27.6743°S 152.9029°E / -27.6743; 152.9029
Owned by Queensland Rail
Operated by City network
Line(s) Springfield
Distance 30.20 kilometres from Central
Platforms 2 (1 island)
Tracks 2
Connections Bus
Construction
Structure type Elevated
Parking 500 bays
Bicycle facilities 120
Disabled access Yes
Other information
Status Staffed
Station code 600089 (platform 1)
600090 (platform 2)
Fare zone go card 6
Website Queensland Rail
History
Opened 2 December 2013
Electrified Yes
Services
Preceding station   Queensland Rail   Following station
toward Bowen Hills
Springfield LineTerminus

Springfield Central railway station is the terminus station of the Springfield line in Queensland, Australia. It serves the Ipswich suburb of Springfield.

History

Springfield Central station opened on 2 December 2013 as the terminus station of the Springfield line.[1][2][3]

The station is situated on a 900-metre viaduct. It includes a car park for 100 vehicles with an additional 400 vehicle spaces on Greenbank Arterial Road which was completed in early 2014.[2][3] Provision has been made to extend the line.

Services

Springfield Central is served by trains operating to and from Kippa-Ring and Bowen Hills. Some services extend to Petrie, Caboolture and Nambour.[4]

Services by platform

Platform Line Destinations Notes
1 Springfield Kippa-Ring & Bowen Hills [5]
Petrie, Caboolture & Nambour Peak hours only
2 Springfield Kippa Ring & Bowen Hills Weekdays only[6]
Petrie, Caboolture & Nambour Peak hours only

Westside Bus Company operate three routes via Springfield Central station:

References

  1. Springfield rail line opening December 2013 TransLink
  2. 1 2 Kieran Banks (2 December 2013). "Fast track to growth: Springfield train line is opened". The Queensland Times.
  3. 1 2 "Richlands-Springfield Central railway opens" Railway Digest January 2014 pages 34-39
  4. Springfield line timetable TranLink 20 January 2014
  5. "Springfield Central Platform 1". Translink.
  6. "Springfield Central Platform 2". Translink.
  7. Route 522 timetable TransLink 2 December 2013
  8. Route 526 timetable TransLink 2 December 2013
  9. Route 534 timetable TransLink 20 January 2014
This article is issued from Wikipedia - version of the 10/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.