Santa Fe Urban Train
| |
Overview | |
---|---|
Service type | Commuter rail |
Status | Active |
Locale | Santa Fe |
First service | January 11, 2016 |
Current operator(s) | Government of Santa Fe Province |
Former operator(s) | Ferrocarriles Argentinos |
Route | |
Start | El Molino |
Stops | 6 |
End | Don Bosco |
Distance travelled | 3.7 km (2.3 mi) |
Average journey time | 15' |
Service frequency | 30' |
Line used | Belgrano |
On-board services | |
Class(es) | Unique |
Technical | |
Track gauge | 1,000 mm (3 ft 3 3⁄8 in) |
Electrification | No |
Operating speed | 40 km/h (25 mph) |
Track owner(s) | Government of Argentina |
Santa Fe Urban Train | |||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | |||||||||||||||||||||||||||||||||||||||||||||
|
The Santa Fe Urban Train (in Spanish: "Tren Urbano de Santa Fe") is 3.7 km (2.3 mi) commuter rail serving the metropolitan area of Santa Fe city in Argentina. It has 8 stops, extending from El Molino to Don Bosco stations,[1] running on the Belgrano Railway Ramal F tracks at a speed of 40 km/h (25 mph).[2]
The Tren Urbano complements other forms of public transportation on the city such as buses and cycling. Rolling stock are railbuses by local manufacturer TecnoTren and already used in the University train of La Plata.
History
The first project of an urban railway had been featured in 2010, with two routes suggested, the first connecting Guadalupe station with the port of Santa Fe and the second joining both stations, Belgrano and Mitre railways. The project also planned an estimated journey time of 30 minutes and a frequency of one service per hour. The train only would run during the day because tracks were used by freight services (currently operated by Trenes Argentinos Cargas y Logística) by night.[3]
Due to the Government of Argentina did not approve the original project, the provincial government had to change it to a shorter path running on tracks not used by freight concessionaires. That was the main condition required by the Nation to allow passenger trains running in the city.[3]
Therefore, the route was set from former Molino Franchino (a former flour mill, currently an exhibition centre named "El Molino Fábrica Cultural")[4][5] in the corner of Pedro Vittori and Boulevard Gálvez, where a bus stop already existed, remodeling it to make connections with train and cycling transport. Initial costs of the works were estimated at A$ 8 million.[6] Departing from Molino Franchino, the train will run to the north, crossing Parque Federal, Puente Negro and finishing in Esquina Encendida[7] (with a new station named "Don Bosco"), on the corner of Zeballos and Zuviría streets.[8]
Works also included the construction of the intermediate stops, segregated cycle facilities along the way, the installation of traffic lights in all the level crossings.[2][9] and the reconditioning of the existing tracks. The total costs of the works increased to over A$25 million.[10]
By July 2015, all the electronic warning devives had been installed in the 22 level crossings of the line.[11]
The service was put into operation on January 11, 2016,[12] but it only run for three days because of a motor breakdown. The service continued undefinitely interrumpted since February[13] to July 2016, when it was put into operation again.[14]
See also
Wikimedia Commons has media related to Santa Fe Urban Train. |
References
- ↑ "Mirá dónde podés tomar el tren urbano", El Litoral, 12 Jan 2016
- 1 2 "El futuro tren urbano realizará su recorrido en sólo 10 minutos". Agencia Federal de Noticias. 9 January 2015.
- 1 2 "Con una sola oferta, el tren urbano comienza a ponerse en movimiento". El Litoral. 27 October 2014.
- ↑ "Molino Franchino". Government of Santa Fe.
- ↑ "El Molino Fábrica Cultural" (PDF). Government of Santa Fe.
- ↑ "Tren urbano: se licita la señalética". Rieles. 14 October 2014.
- ↑ "La Esquina Encendida". Government of Santa Fe.
- ↑ "Tren Urbano: este lunes comienzan las obras de recuperación de las vías". UNO Santa Fe. 29 November 2014.
- ↑ "Licitan la construcción de las ocho paradas". Rieles. 9 December 2014.
- ↑ "Siguen las obras en las vías". Agencia Fe. 19 February 2015.
- ↑ "Tren urbano: ultiman detalles del sistema de seguridad vial". El Litoral. 19 July 2015.
- ↑ "Se puso en marcha el Tren Urbano con 20 viajes diarios", El Litoral, 12 Jan 2016
- ↑ "El tren urbano sigue en reparación", El Litoral, 5 Feb 2016
- ↑ "Después de tres meses, volvió a funcionar el tren urbano", Agencia Fe, 19 Jul 2016