Sandy Hollow – Gulgong railway line

Sandy Hollow- Gulgong Line
Legend
From Sandy Hollow on the Merriwa Line
Baerami
Widden
Kerrabee
Bylong
Akuna
Wollar
Wilpinjong Colliery
Ulan
Ulan Colliery
to Gulgong on the Gwabegar line

The Sandy Hollow – Gulgong railway line is a railway line in eastern New South Wales, Australia. The line forms a cross country connection from the Main North line in the Upper Hunter region to the Gwabegar line in the Central West region. The line is approximately 125 kilometres in length. From the Gwabegar line trains can then ultimately reach the Main West line creating a circuitous bypass of Sydney for freight traffic heading between the west and north of New South Wales. The line was opened in 1985.[1]

History

A line was built from Muswellbrook to Denman in 1915 and then extended to Sandy Hollow and Merriwa in 1917. The section between Sandy Hollow and Merriwa has been closed since 1988.[2] The Sandy Hollow Line between Sandy Hollow, Gulgong and Maryvale, (between Wellington and Dubbo), was originally surveyed in 1860 as a more easily graded crossing of the Great Dividing Range than the Blue Mountains line nearer to Sydney. It was not commenced, however, until 1937,[3] when it began as an unemployment relief scheme of the NSW Government, achieving infamy for having no modern mechanical devices used on it, other than trucks carrying concrete for the tunnels and bridge piers, all other work being done with picks, shovels, hand drills, horses and carts. Construction continued through World War 2 at a desultory pace, held up by money, labour and especially steel shortages, only to be abandoned unfinished, approximately 92% complete, a few years later in 1951. The line crosses the Great Dividing Range by following the Goulburn River and Bylong Valleys from Sandy Hollow to Bylong, with a tunnel under Cox's Gap.

The tunnel, No.1 of three in the Bylong range and five on the entire line, that was built under Cox's Gap between 1946 and 1949 was used for eastbound road traffic on the Bylong Valley Way until work recommenced in the early 1980s. It was used in 1978 in the filming of the opening scene for the television series Torque, hosted by Peter Wherrett. In that scene, a Bolwell Nagari driven by Wherrett approached as lights in the dark tunnel, then the camera drew back as the car drove out of the tunnel.[4]

The line was opened as a heavy-haul railway to the major coal mine at Ulan in 1982 and extended to Gulgong in 1985 to meet the line to Dunedoo and Dubbo.[5] It is unlikely to be extended to Maryvale.

Current status

Bylong Valley Way passes under line west of Cox's Gap

Because coal from Ulan is now the primary function of this line, Australian Rail Track Corporation (ARTC) refer to the line as the Ulan line all the way from Muswellbrook to Gulgong. Coal from the Wilpinjong and Anvil Hill mines will also use this line when those mines begin production. In preparation for this, ARTC are upgrading the lines in the Muswellbrook yard and adding two more passing loops to the Ulan line in 2007.[6]

The line previously used outdated electric train staff (ETS) safeworking procedures in 5 sections over its length. This is being replaced with centralised traffic control (CTC) in 5 stages. The stages correspond to the 5 ETS sections, numbered from Muswellbrook to Gulgong. The 4th stage, to Ulan, was completed in May 2008.[7] This extends CTC to the westernmost coal mine on the line, covering the majority of train movements on the line.

Progress at upgrading the signaling by ARTC was criticised as slow and causing bottlenecks. The upgrade was previously due to be completed at the end of 2007.[8]

Station layout

Ulan has a balloon loop to terminate, load, and return the coal trains up to 1800m long. There is also a crossing loop 900m long. Unlike earlier plans, there are no sidings for general freight, nor any passenger platforms.

Wilpinjong also has a balloon loop.

Crossing Loops

In 2007, there are four crossing loops, though ARTC plan several more, plus and upgrade to centralised traffic control signalling. The loops (and their lengths) are located at:

In 2013, additional crossing loops were installed.

See also

References

  1. "Sandy Hollow- Gulgong Line". www.nswrail.net. Retrieved 2006-05-01.
  2. "Merriwa Branch". www.nswrail.net. Retrieved 2006-12-03.
  3. The Sandy Hollow-Maryvale Railway Wright, R Australian Railway Historical Society Bulletin, August, 1957 pp123-128
  4. "Sandy Hollow Self Drive Tour Circuit". Retrieved 2007-06-07.
  5. "Sandy Hollow - Gulgong Line". www.nswrail.net. Retrieved 2006-12-03.
  6. "ARTC letter to Mid-Western Regional Council re Ulan line" (PDF). www.midwestern.nsw.gov.au. Retrieved 2007-04-29.
  7. ARTC announcement of completion of stage 4
  8. Ferguson, Adele (29 September 2007). "1920s system hits coal exports". The Australian. Retrieved 2010-05-09.
This article is issued from Wikipedia - version of the 6/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.