Pike River Mine
Location | |
---|---|
Pike River Mine | |
Location | Greymouth |
Region | West Coast Region |
Country | New Zealand |
Coordinates | 42°12′19″S 171°28′56″E / 42.20516°S 171.48221°ECoordinates: 42°12′19″S 171°28′56″E / 42.20516°S 171.48221°E |
Production | |
Products | Coal |
Financial year | 30 June |
History | |
Opened | 2009 |
Closed | 2011 (possibly permanently) |
Owner | |
Company | Pike River Coal |
Website | Pike River Coal website |
Year of acquisition | 2008 |
The Pike River Mine is a coal mine operated by Pike River Coal 46 km (29 mi) north-northeast of Greymouth in the West Coast Region of New Zealand's South Island.
It was to begin production in early 2008, and was initially expected to produce around one million tonnes of coal per year for around 20 years,[1] making the mine the second-largest coal export mine in the country, as well as the largest underground coal mine of the country. The estimate for production was reduced to between 320,000 and 360,000 tonnes for 2011. The coal of the mine is described as "New Zealand's largest known deposit of high fluidity and quality hard coking coal" (a type of coal in high demand for iron smelting),[2] and was expected to earn around NZ$170 million in export income annually.[3]
Various setbacks occurred during late 2007 and early 2008 delaying the start of coal production. While mine operators were originally confident that production would still start in 2008 (having reached within 400 m (1,300 ft) of the coal seam in early 2008),[4] in mid-2009 the mine was still not producing at expected levels, with the target of the first 60,000 tons of coal to be shipped having slipped to early 2010. The mine operators noted that technical difficulties with several mining machines were to blame for the delays, which also forced the company to ask for an extension from its financiers.[5] In February 2010, the first export shipment of 20,000 tons of coal was delivered to India for use in steel production.
An explosion on Friday 19 November 2010 trapped 29 workers inside the mine. Rescuers delayed entering the mine, due to the risk of another explosion. On 24 November, a second explosion occurred and it was subsequently presumed that the workers could not have survived. A third explosion occurred at 3:39 pm 26 November; it appeared to be smaller than the first two. A fourth explosion occurred on 28 November at 1:55 pm. As of January 2011 the mine has been ordered sealed and the recovery attempt abandoned for the time being.[6]
Approvals history
The mine has a development and consenting history going back to the 1970s, with the first geologists and surveyors having explored the area in the 1940s. The mine is located approximately halfway between Greymouth and Reefton, close to the Pike Stream, a tributary of the Big River in a region that already has a long history of coal- and gold-mining activity. It is located on Crown land administered by the Department of Conservation, and adjacent to the Paparoa National Park.[3][4] Because of the status of the land, Pike River Coal Ltd had to obtain the Minister of Conservation's agreement to an access arrangement for mining under Section 61(2) of the Crown Minerals Act 2001.[7]
On 12 March 2004, Minister of Conservation Chris Carter approved the access arrangement for Pike River Coal Ltd. The arrangement included four 1.5-metre (4.9 ft)-wide emergency escape shafts within the boundaries of Paparoa National Park and a requirement for Pike River Coal Ltd to spend NZ$70,000 annually on conservation projects. Carter stated that the "safeguards and compensation" outweighed the inconsistencies with objectives of the Conservation Act 1987 and the relevant management plans.[8]
Due to the location, the conditions of the access arrangement included special considerations for the environment, such as minimising tree felling and a requirement to reinstate all above-ground areas after the cessation of mining.[3][4] Opponents of the mine strongly criticised the approval of the access agreement, noting that the coal is not intended for domestic use but simply a commercial operation, and thus should not have been allowed to go forward in a sensitive location. Forest & Bird also criticised the fact that the Minister of Conservation chose to ignore the report from the Department of Conservation stating that the mine would be damaging to the local environment.[2][9] Greenpeace Aotearoa New Zealand also criticised the project for furthering the use of fossil fuels instead of developing sustainable alternatives.[2]
Mine operation
In October 2008, coal production started and in November 2008, Gerry Brownlee, the Minister of Energy and Resources and Minister for Economic Development, formally opened the mine.[10] However, production was slow initially, and took until 2009/2010 to reach significant levels.[5]
The coal is mined 200 m (660 ft) underground, at 800 m (2,600 ft) above sea level, quarrying coal from the Brunner coal seam. The coal is taken from the mine via a 'drift', a gently sloping 5-degree tunnel 2.3 km (1.4 mi) long. This tunnel has taken large amounts of dynamite to create, as the rock is described as being up to four times harder than concrete. Since the coal face will be located higher than the tunnel entrance, removal of material to a processing plant 10.6 km (6.6 mi) away will be via a slurry pipeline (with a 35% solids share).[3]
Another major feature of the underground works is a 110-metre (360 ft)-deep ventilation shaft. After local ground conditions were found to be worse than expected, it was excavated with a raise-bore system excavating the 4.25 m (13.9 ft) ventilation shaft from a 0.35 m (1.1 ft) pilot drill shaft.[3][4][11] Access to the top of the ventilation shaft is by helicopter only, even during construction, as conservation restrictions do not allow roads to be built to reach this point.[1] This shaft partially collapsed in 2008 causing further production delays.
The mine also includes underground excavation for the coal slurry handling facility and mine water storage and pumping equipment, with several large galleries of up to 5.5 m (18 ft) width and 11 m (36 ft) height to be excavated.[1] As of 2010, the mine has three main "drives" (shafts).[12]
Originally, once at the processing plant, coal was to be trucked to Greymouth for reshipment at the local port.[3][4] On 27 November 2007, it was announced that the coal from the mine would be transported to Lyttelton for export rather than the previously proposed shipment via the Port of Taranaki. The company has reserved under contract with Toll Rail (now KiwiRail) 1.3 million tonnes of capacity for their coal on the Midland Line between Greymouth and Christchurch, which since upgrading by ONTRACK has a total capacity of four million tonnes per annum.[13]
The mine was to have about 150 full-time staff, though in 2007-2008, there were problems filling all positions, partly because of high demand for the same occupations in the Australian and international job markets.[3][4] In February 2010, Pike River Mine made its first export shipment of 20,000 tonnes of premium hard coking coal to India.[14]
The mine is estimated to have generated about $80 million of economic benefits to the West Coast Region, about $13 million of that in wages.[15]
2010 mine disaster
On 19 November 2010, an explosion in the mine left 29 people dead 2,200 metres (7,200 ft) from the mine's entrance. The mine is around 160 metres (520 ft) below ground, but is primarily accessed horizontally as it lies under the Paparoa Range. Two miners more than 1,000 metres (3,300 ft) from the mine entrance received moderate injuries after being knocked over by the blast. It was predicted it could be several days before the mine was safe enough for rescue workers to enter, as the gases inside were feared to still be explosive. When a borehole was drilled into the area where the miners were thought to be, a level of 95% methane gas was found with the remainder primarily carbon monoxide and it appeared there was little chance of finding any of the miners alive.[16][17][18][19][20][21] Although families had held out hope that some of the miners may have survived, it was believed by the rescue team that all had been killed by the initial explosion. The mine had not collapsed and air was blowing freely throughout the tunnels indicating that there were no obstructions to survivors leaving the mine or indicating their presence by tapping on pipes or calling for help.[22]
At 2:37 PM NZDT on 24 November, a second explosion occurred, which was so severe that later that afternoon Peter Whittall (CEO of Pike River Coal Ltd) announced that it was extremely unlikely that any of the miners were still alive, as the magnitude of the second explosion and the high levels of toxic gases were too great for anyone to be able to survive.[23]
A third explosion occurred at 3:39 PM 26 November; it appeared to be smaller than the first two. On Sunday, 28 November at 1:55 PM NZDT, a fourth explosion occurred. Flames and smoke poured out of the mine causing nearby scrub to catch fire. Whittall stated there was now a coal fire burning in the mine rather than a gas fire. It is unknown at this time if the actual coal seam is on fire or if it is "rubbish" coal that has been dislodged from previous explosions.[24]
A mine expert theorised that a blast furnace level of heat could have occurred within the mine, reaching over 1,200 °C (2,190 °F).[25] A collapse of any part of the mine was however considered unlikely because of the strength of the construction.[26]
On 10 November 2011 charges were laid against 3 parties in the Greymouth District Court. The charges relate to alleged Health & Safety failings at the mine. At the time of writing the parties against whom the charges have been laid have been withheld.[27]
In December 2012, Prime Minister John Key said he would apologise in person to the families of the deceased, for the Government's weak regulations and inadequate inspection regime.[28] The Minister of Labour Kate Wilkinson resigned her portfolio on 5 November 2012 following the Royal Commission's criticism of her department.[29]
Following the liquidation of Pike River Coal, Solid Energy purchased the assets of the company .[30] The government then purchased the 3580 ha of land around the Pike River Mine. The envirionment minister Nick Smith announced on 15 November 2015 that the 3580 ha of land is to be added to the Paparoa National Park, and a 45 km walkway, the Pike 29 Memorial Track from Blackball to Punakaikai through the park constructed as a memorial to the 29 miners lost in the 2010 Pike River Mine disaster. .[31]
Holding company
Pike River Coal Ltd is listed on the New Zealand and Australian stock exchanges. It raised NZ$85 million in additional capital for expanding the mine in 2007.[32] As of August 2007, over NZ$100 million had already been invested into developing the mine.[33]
The development was valued at NZ$2.3 billion and was initially held by New Zealand Oil & Gas (29% stake plus options and bonds[34]) as well as the two Indian companies, Gujarat NRE Coke Limited (17% share), and Saurashtra Fuels Private Limited (15% share), with the two latter companies intending to buy about half the running production of the mine's coal.[3] After the IPO, the ownership percentages changed to NZ Oil and Gas 31%, Gujarat NRE Coke 10%, Saurashtra Fuels 8.5%, with private minority shareholders holding 7.9% and the remaining 42.5% having been sold to the general public.[4]
Economic aftermath
On 13 December 2010, Pike River Coal Ltd was put into receivership, with three partners in PricewaterhouseCoopers appointed as receivers.[35] On 15 December 2010, it was announced that about 114 of 157 staff in the company would be made redundant immediately, with some severance benefits paid out of the remaining company funds. It was also announced that it would be unlikely that the further numbers of contracting staff also unemployed or unpaid due to the mine accident would receive any money, as they legally ranked low in the order of creditors.[36]
Pike River Coal originally stated that they hoped to be able to reopen the mine, hopefully before the completion of the inquiry. There is also some concern about the direct economic consequences of the current mine closure, as contracts for work related to the mine have been cancelled or are stalled.[15] The mine remains closed as of the end of 2010, with no indications when or if it would reopen. Most staff have been made redundant, and many contractors are also unemployed or remain unpaid for earlier work.[36]
In early 2011, it was reported that the receiver was considering different ways of treating the remaining assets of the Pike River Mine Ltd company. While it was possible that the mine would be sold, the option of fencing the area and returning it to the Department of Conservation was a 'worst-case' possibility.[6] On 9 March 2011, the receivers took over full control of the mine from the NZ Police.[37][38]
In March 2011, Solid Energy was looking at purchasing the coal rights and access arrangements. The company said that any proposal to buy and reactivate the mine would include recovery of the dead miner's bodies, if feasible. They also noted that they saw the potential need to combine underground with opencast mining at the site.[39] With the site sitting on conservation land, this is likely to be controversial. Open-cast mining in a national Park is banned by the Crown Minerals Act. The Pike River mine reaches the Brunner coal seam at depths of 150 to 200 metres below ground level. This is deeper than other NZ open-cast coal mines and likely to be uneconomic.[40] However, in 2014 Solid Energy decided that it was too risky to re-enter the mine to recover any remains from the mine. [41]
In August 2011, KiwiRail blamed the Canterbury Earthquakes and "loss of Pike River Mine volumes" for its poor end of year result in 2010 – 2011.[42]
Following the liquidation of Pike River Coal, the government purchased 3580 ha of land around the Pike River Mine. Envirionment minister Nick Smith announced on 15 November 2015 that the land is to be added to the Paparoa National Park, and a 45 km walkway, the Pike 29 Memorial Track from Blackball to Punakaikai through the park constructed as a memorial to the 29 miners lost in the 2010 Pike River Mine disaster. .[31]
See also
References
- 1 2 3 Digging deep around New Zealand, LG - New Zealand Local Government, Volume 44 No 5, May 2008, Page 18
- 1 2 3 Coal Mine Approved for New Zealand National Park - 'Mines & Communities' website. Environmental News Service (ENS), Tuesday 16 March 2004. Retrieved 23 September 2007.
- 1 2 3 4 5 6 7 8 How the West was won: Pike River on track, New Zealand Construction News, Volume 2, Issues 3, July 2007
- 1 2 3 4 5 6 7 Grant Bradley (25 February 2008). "Inside Pike River: Rich rivers of black gold in the pipeline". New Zealand Herald. Archived from the original on 17 January 2011. Retrieved 21 November 2010.
- 1 2 NZPA (25 August 2009). "Pike River coal delayed again". The New Zealand Herald.
- 1 2 "Closing mine 'worst case scenario'". The New Zealand Herald. 14 January 2010. Retrieved 13 January 2011.
- ↑ "Section 61(2) of the Crown Minerals Act 2001". Crown Minerals Act 1991 No 70, Public Act. New Zealand Legislation. 6 November 2008. Retrieved 22 November 2010.
- ↑ Chris Carter, Minister of Conservation (12 March 2004). "Conditional approval for Pike River Coal mine proposal". New Zealand Government Media Release. Retrieved 22 November 2010.
- ↑ Undermining Paparoa National Park, Conservation News, Forest & Bird, No 129, February 2003
- ↑ "Gerry Brownlee To Open Pike River Coal Mine" (Press release). Pike River Coal Limited. 21 November 2008. Retrieved 29 November 2010.
- ↑ "Pike River changes drilling plan". The New Zealand Herald. NZPA. 2 April 2008. Retrieved 3 November 2011.
- ↑ "Pair escape by climbing up air vent". The Dominion Post. 20 November 2010. Retrieved 20 November 2010.
- ↑ "Pike River Coal Announces New Coal Transport Route" (Press release). Pike River Coal Limited. 28 November 2007. Retrieved 29 November 2007.
- ↑ "Pike River Coal Celebrates Milestone" (Press release). Pike River Coal Limited. 19 February 2010. Retrieved 29 November 2010.
- 1 2 "Economic impact of Pike River tragedy felt on West Coast". The New Zealand Herald. 1 December 2010. Retrieved 9 December 2010.
- ↑ Fletcher, Hamish; Griffin, Peter (20 November 2010). "Mine blast: How the Pike River rescue will work". The New Zealand Herald. Retrieved 20 November 2010.
- ↑ Amy Glass, Giles Brown and Andrea Vance (20 November 2010). "Rescuers wait on final all-clear to enter mine". The Press. Retrieved 20 November 2010.
- ↑ "Rescue for trapped West Coast miners could take days". Stuff.co.nz. 19 November 2010.
- ↑ "Rescue team yet to enter West Coast mine". New Zealand Herald. 19 November 2010.
- ↑ Doogue, Geraldine (20 November 2010). "NZ Mine Explosion". ABC Radio National Saturday Extra. Australia. Retrieved 20 November 2010.
- ↑ "Gas fears stalling mine rescue". ABC News. Australia. 20 November 2010. Retrieved 20 November 2010.
- ↑ Claire Harvey Never a Hope: This was not going to be Chile The Advertiser 28 November 2010 Pg 41-42 47-48
- ↑ Booker, Jarrod (24 November). "Mine tragedy: Second blast ends all hope". The New Zealand Herald. Retrieved 24 November 2010. Check date values in:
|date=
(help) - ↑ Catherine Masters and NZPA (29 November 2010). "Fourth blast raises chance of sealing Pike River mine". The New Zealand Herald. Retrieved 29 November 2010.
- ↑ Bradley, Grant (23 November 2010). "Blast fireball may have made mine a furnace, says scientist". The New Zealand Herald. APN. Retrieved 23 November 2010.
- ↑ "Mine blast: Pike River collapse 'unlikely', says CEO". The New Zealand Herald. APN. 20 November 2010. Retrieved 20 November 2010.
- ↑ Booker, Jarrod (10 November 2011). "Charges laid over Pike River blast". The New Zealand Herald. Retrieved 10 November 2011.
- ↑ "Key to apologise to Pike families". 3 News NZ. 10 December 2012.
- ↑ "Charge Pike River bosses, families say". Stuff.co.nz. Auckland. 5 November 2012. Retrieved 5 November 2012.
- ↑ "Pike River mine sold to Solid Energy". Stuff (Fairfax). 3 December 2015.
- 1 2 "Pike River-Walkway confirmed for West Coast". Stuff (Fairfax). 15 November 2015.
- ↑ Pike River Coal project makes rapid strides - Ministry of Economic Development of New Zealand, Tuesday 31 July 2007
- ↑ NZPA (29 August 2007). "Pike River mine investment tops $100m". The New Zealand Herald. Retrieved 7 December 2010.
- ↑ Krupp, Jason (23 November 2010). "NZ Oil & Gas shares plummet". Business Desk. NZX Limited/Fairfax New Zealand Limited. Retrieved 26 November 2010.
- ↑ "Receivers appointed for PRCL" (Press release). NZ Oil And Gas. 13 December 2010.
- 1 2 Leask, Anna (15 December 2010). "Pike River contract staff left out in cold". The New Zealand Herald. Retrieved 20 December 2010.
- ↑ "Pike River Coal to Implement Mine Stabilisation Plan" (Press release). New Zealand Police. 9 March 2011. Retrieved 9 March 2011.
- ↑ "Pike River Coal to implement mine stabilisation plan" (Press release). PwC New Zealand. 9 March 2011. Retrieved 9 March 2011.
- ↑ Donnell, Hayden (15 March 2011). "Solid Energy says it wants to buy Pike River". The New Zealand Herald. Retrieved 14 March 2011.
- ↑ Tim Hunter (15 March 2011). "A few words about open-cast mining". Stuff. Fairfax. Retrieved 15 March 2011.
- ↑ "Solid-Energy wont re-enter Pike River Mine". Stuff (Fairfax). 6 November 2014.
- ↑ "KiwiRail results show impact of quakes, Pike River". New Zealand Herald. 29 August 2011. Retrieved 25 November 2011.