Oklahoma City Crosstown Expressway
Oklahoma City Crosstown Expressway | |
---|---|
I-40 Crosstown | |
Route information | |
Maintained by ODOT | |
Length: | 5.00 mi (8.05 km) |
Existed: | early 1960s – present |
Major junctions | |
West end: | Agnew Avenue in Oklahoma City |
I‑35 / I‑235 / US-77 / US-62 in Oklahoma City | |
East end: | I‑40 / I‑35 / I‑235 / US-77 / US-62 Crossroads of America in Oklahoma City |
Highway system | |
The Oklahoma City Crosstown Expressway, aka I-40 Crosstown, is a roughly five-mile (8.0 km) stretch of Interstate 40 (I-40) just south of Downtown Oklahoma City, running along the Oklahoma River between Agnew Avenue and the I-40/I-35/I-235 Crossroads of America junction. Prior to 2012, the I-40 Crosstown was an elevated stretch that bisected downtown. The Oklahoma City Crosstown is the defacto east–west artery through Oklahoma City, serving as an unofficial dividing line between north and south Oklahoma City (the official dividing line for address purposes is Sheridan Avenue). It is owned and maintained by the Oklahoma Department of Transportation (ODOT).
Context
Oklahoma City Crosstown Bridge
The Oklahoma City Crosstown was the busiest of Oklahoma's many aging bridges. While the Crosstown Expressway designed to withstand about 76,000 vehicles a day,[1] by 2010 it was used by nearly 120,000 vehicles a day.
The Crosstown was completed in the 1960s using an engineering process commonly termed as "fracture critical",[2] a process that has not been used since the 1970s because it does not provide redundancies.[3] According to Brian Windsor, an ODOT structural engineer, without redundant support, the failure of a single beam created the risk of total collapse of that section of bridge.[4] The entire stretch of the original I-40 Crosstown Expressway was elevated, and at some points, the elevation is as much as 50 feet (15.2 m).
According to a 2006 report, Oklahoma led the nation with 6,299 "structurally deficient" bridges.[5] Attention to the Crosstown project increased after the collapse of a stretch of I-35W in Minneapolis, Minnesota on August 1, 2007. At that time, ODOT released a statement indicating that the condition of the Crosstown was "deteriorating", but that it "remained safe."[6]
Concerns about whether the Crosstown Bridge would last until its 2012 replacement date increased on September 23, 2007, when a hole in the Crosstown resulted in closure of all but one lane and created significant traffic delays. Other safety problems of the Crosstown included falling chunks of concrete and a lack of breakdown lanes. In an August 2007 poll sponsored by The Oklahoman, nearly 2⁄3 of respondents indicated that they were "afraid to drive across the Crosstown bridge in Oklahoma City".[7]
Status
On January 5, 2012 eastbound traffic was transferred to the new alignment of the I-40 Crosstown Expressway, with westbound following on February 19. The original I-40 Crosstown Expressway bridge has since been removed.
As of 2016 a new boulevard in its place is currently under-construction.
Relocation Project
History
In May 2002, federal funding was secured to finance replacement of the Oklahoma City Crosstown. Rather than replace the existing structure, a new stretch of I-40 will be constructed about five blocks south of the current location. Initial estimates of the Crosstown replacement project were that the project would take 8 years with a completion date of 2010,[8] and would cost $360 million.[9] The most recent revision to this estimate was released in July 2007, and indicated that the project will be completed in 2012 and will cost $557 million. The ground-level boulevard to replace the current Crosstown bridges is no longer included in the cost estimates. The new Crosstown will have ten lanes for traffic traveling at 60 miles per hour (97 km/h). It is being designed to carry 170,000 vehicles per day, and will have shoulders for disabled vehicles. Over 95% of current traffic on the Crosstown is through traffic, not transferring to or from downtown streets.
More recently, the Crosstown project has come under serious controversy. In an era of fluctuating energy prices and changing circumstances, several citizen's groups are challenging the project. Devon Energy announced in March 2008 it would construct a one million square foot office tower in the center of a revitalized downtown to house between 2,000 and 3,000 of its employees.[10] The Devon location will be ten blocks away from the interstate instead of four blocks, resulting in increased congestion on slower downtown streets during rush hour. Under current construction plans, part of Oklahoma City's Union Station railyard would be sacrificed to make space for the freeway, leading to concerns that this would disable the station from use in future light rail, commuter rail or traffic circulation use. An unprecedented ruling in June 2008 by the Federal Surface Transportation Board held that the BNSF railway made fraudulent representations in their request for abandonment of the freight line that would enable the Crosstown, and denied the abandonment. However, in May 2009 the final decision from the STB reversed the earlier ruling, allowing the ODOT to move ahead with their plans.[11]
ODOT has not sought to redirect semitrailers off the former I-40 stretch of deteriorating overpasses. ODOT Director Gary Ridley said the current I-40 will "absolutely" survive through 2012, the completion date for the realignment, adding, "If we felt there was anything wrong that would cause us concern, we would close it, and we wouldn't think twice about it."[12] However, in a filing with STB, Ridley urged a quick ruling because "new serious issues including cracks in fracture critical members are constantly being discovered and repaired. The condition and obsolescence of the existing bridges constitutes serious concern for the Department."[13] Other highway connections, running east and west, include I-240 and I-44.
Timeline
- January 1996: Citizens advisory committee formed.[14]
- December 1998: ODOT chooses route for new Crosstown[15]
- February 7, 2001: Formal public hearing held at the Myriad Convention Center.[15]
- May 12, 2002: ODOT announces federal funding secured.[16]
- May 13, 2002: Kick off meeting/groundbreaking.
- March 20, 2003: Acquisition of all occupied residential property completed.[17]
- 2004: Railroad and utility relocations were to have begun.[18]
- August 1, 2005: Construction contract awarded to Muskogee Bridge Company.[19]
- 2007: Construction was to have been completed on new alignment for I-40.[18]
- January 2007: Surface Transportation Board approves railway abandonment application of Burlington Northern/Santa Fe (BNSF).[20]
- July 2007: The first section of the new Crosstown Expressway: Three sections, including two 80-foot (24 m) long bridges and one railroad bridge were completed.[21]
- May 2007: The State Convention of the Oklahoma Democratic Party adopted a resolution calling for a moratorium on construction and the appointment of a special commission to "consider alternatives that would preserve the Union railyard before any more public money is spent on this project."[22]
- August 1, 2007: Collapse of I-35 bridge in Minnesota
- September 20, 2007: Hole in Crosstown closed all but one lane of traffic and created significant traffic delays.
- November 29, 2007: Hole in Crosstown closed all but one lane of westbound traffic east of Robinson Avenue.[23]
- March 14, 2008: Hole in Crosstown closed all but one lane of westbound traffic.
- March 28, 2008: Hole in Crosstown closed all but one lane of westbound traffic from the I-235 junction to Classen Boulevard.[24]
- June 5, 2008: Surface Transportation Board reopens railway abandonment case and declares it void due to false statements made by BNSF.[20]
- July 15, 2008: BNSF files petition with STB for relocation (instead of abandonment) of existing railway.[25]
- September 20, 2008: ODOT Director Gary Ridley announced no funds are available to tear down the existing Crosstown Expressway as originally planned. He estimated the cost of demolition and removal to be an additional $100 million.[26]
- September 24, 2008: The City Council of Norman, Oklahoma, adopted a resolution requesting the Governor to appoint a commission to consider alternatives to removal of the Union Station railyard.[27]
- October 6, 2008: The City Commission and the Economic Development of Authority of Shawnee, Oklahoma, adopted resolutions requesting Governor Brad Henry, a native of Shawnee, to appoint a commission to consider alternatives to removal of the Union Station railyard. In addition to Norman, the cities of Chickasha and El Reno have also passed similar resolutions.[28]
- October 20, 2008: The Shawnee City Commission by a 5–2 vote denied a request by ODOT officials to reconsider the resolution.[29]
- April 7, 2009: Another hole and a loose expansion joint in Crosstown closed all but one lane of westbound traffic between the I-235 junction and Classen Boulevard[30]
- January 5, 2012: Eastbound lanes were transferred to the new alignment.
- February 17, 2012: Completion date for new Crosstown Expressway[1]
Neighborhood displacement
Under the original Environmental Impact Statement, residents of two neighborhoods were to be displaced by construction of the new Crosstown Expressway. Construction resulted in the demolition of 165 properties in the Walnut Grove and Riverside neighborhoods.[31] The realignment will now directly result in reconstruction of 590 acres (2.4 km2) in Phase I and an additional 785 acres (3.18 km2) in Phase II, for a total of 1,375 acres (5.56 km2) in the core of Oklahoma City.[32]
Future land use (Core To Shore)
After the completion of the new I-40 Crosstown, the existing bridge was demolished. While ODOT is responsible for the relocation of the I-40 Crosstown and the subsequent demolition of the existing structure, the city of Oklahoma City will take the lead in determining the future use of the land currently occupied by the existing crosstown. On June 20, 2006, the Oklahoma City Council[33] announced a $387,000 contract for professional consulting services with the URS Corporation "to recommend specific actions to facilitate redevelopment within the area impacted by the relocation of the downtown section of I-40, Reno Avenue, new I-40 alignment, Western Avenue and I-35/I-235"[33]
On October 5, 2006, Oklahoma City Mayor Mick Cornett introduced the 'Core to Shore' project team which has the task of "planning and developing the area south of downtown and north of the Oklahoma River where Interstate 40 currently runs."[34] This team consists of community leaders as well as representatives from URS Corp.
Exit List
The entire route is in Oklahoma City, Oklahoma County.
mi | km | Exit | Destinations | Notes |
---|---|---|---|---|
I‑40 continues west toward Amarillo, Texas and West Suburbs | ||||
148A | Agnew Avenue, Villa Avenue | |||
148B | Oklahoma City Boulevard – Downtown | new Boulevard to Downtown Oklahoma City planned to follow the previous I-40 Crosstown Bridge alignment, currently in progress | ||
148C | Pennsylvania Avenue (Penn) | |||
149 | Western Avenue | |||
150A | Shields Boulevard | Eastbound Exit Only | ||
150B | Robinson Avenue | Westbound Exit Only – to Downtown, no Entrance | ||
151A | Oklahoma City Boulevard – Downtown | future boulevard along old I-40 Crosstown Bridge alignment | ||
151B | I‑35 south / US-62 west (US-77 south) – Dallas | Western terminus of I-35/US-62 concurrency | ||
151C | I‑235 north (US-77 north) – Edmond, State Capitol, Oklahoma Health Center | Also signed as exit 126 westbound, due to I-35 concurrency | ||
I‑40 continues east toward Fort Smith, Arkansas and East Suburbs | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- 1 2 "OKC I-40 Crosstown". Okladot.state.ok.us. Archived from the original on August 31, 2011. Retrieved September 19, 2011.
- ↑ Southerland, Paul (August 5, 2007). "Crosstown close up". The Daily Oklahoman. p. A11.
- ↑ Transportation Resource Board (December 12, 2006). Development of System Fracture Analysis Methods and Inspection Standards for Fracture Critical Steel Bridges.
- ↑ The Oklahoman. August 5, 2007. p. 11A. Missing or empty
|title=
(help) - ↑ TRIP. 2006. Bridge conditions 2006. http://www.tripnet.org/BridgeConditions2006.pdf[]
- ↑ Oklahoma Department of Transportation (August 2, 2007). "Crosstown bridge remains safe" (PDF) (Press release). Oklahoma Department of Transportation.
- ↑ The Oklahoman. August 9, 2007. p. 2A. Missing or empty
|title=
(help) - ↑ Oklahoma Department of Transportation (n.d.). "I-40 Crosstown Expressway estimated future timeline" (PDF). Oklahoma Department of Transportation. Archived from the original (PDF) on October 12, 2010.
- ↑ United States Office of Management and Budget (2005). "I-40 Oklahoma City Crosstown Expressway earmark". United States Office of Management and Budget.
- ↑ "Devon Energy plans downtown OKC tower". Tulsa World. March 14, 2008. Retrieved September 19, 2011.
- ↑
- ↑ http://www.forbes.com/feeds/ap/2008/10/06/ap5515823.html
- ↑ "Surface Transportation Board Filing". Surface Transportation Board. January 30, 2009. Retrieved September 19, 2011.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- 1 2 "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- 1 2 "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on October 12, 2010. Retrieved March 19, 2008.
- 1 2 Jenny, Walter, Jr. "I-40 plan may derail". Opinion. The Edmond Sun. Retrieved September 19, 2011.
- ↑ McNutt, Michael (July 6, 2007). "Paving the way". The Daily Oklahoman. p. 15A.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on October 22, 2008. Retrieved October 24, 2008.
- ↑
- ↑ "Officials: I-40 Crosstown Down To 1 Lane Due To Hole". Oklahoma City, OK: KOCO.
- ↑ "Justia Regulation Tracker Abandonment exemption: BNSF Railway Co.,". Surface Transportation Board. 58711–58712 [E8–23616]. Retrieved September 19, 2011 – via Regulations.justia.com.
- ↑ "Funding OK'd in Crosstown highway planMoney is still needed to tear down old one, department official says.". Newsok.com. September 20, 2008. Retrieved September 19, 2011.
- ↑ "Norman council is backing Union Station resolutionGroup approaches towns to gain support". Newsok.com. September 25, 2008. Retrieved September 19, 2011.
- ↑ Gire, Amanda (October 9, 2008). "Groups pass resolutions for rail yard". The Shawnee News-Star. Retrieved September 19, 2011.
- ↑ Gire, Amanda (October 21, 2008). "Rail proposal gets another look". The Shawnee News-Star. Retrieved September 19, 2011.
- ↑ "Lanes Along I-40 Near Downtown, Del City Back Open". Oklahoma City, OK: KOCO. April 7, 2009. Retrieved September 19, 2011.
- ↑ Oklahoma Department of Transportation (March 20, 2003). "ODOT hits benchmark with I-40 crosstown property acquisition" (PDF) (Press release). Oklahoma Department of Transportation. Archived from the original (PDF) on October 12, 2010.
- ↑ "Core to Shore". City of Oklahoma City. Retrieved September 19, 2011.
- 1 2 City of Oklahoma City (June 20, 2006). "Regular City Council Meeting June 20, 2006" (PDF). Journal of Council Proceedings. City of Oklahoma City.
- ↑ Core to Shore Steering Committee (October 5, 2006). "Meeting Synopsis" (PDF). Core to Shore Steering Committee.
External links
- Core to Shore Planning Project (City of Oklahoma City)
- Public Information (Oklahoma Department of Transportation)
- I-40 Relocation Project (Oklahoma Department of Transportation)
- Official site for the I-40 Relocation Project (Oklahoma Department of Transportation)
- I-40 Crosstown at Abandoned Oklahoma