North Negros BioPower
North Negros BioPower | |
---|---|
Location of North Negros BioPower in Philippines | |
Country | Philippines |
Location | Manapla, Negros Occidental |
Coordinates | 10°56′41″N 123°10′2″E / 10.94472°N 123.16722°ECoordinates: 10°56′41″N 123°10′2″E / 10.94472°N 123.16722°E |
Status | Proposed |
Commission date | 4th quarter 2018 (planned) |
Thermal power station | |
Primary fuel | cane trash with some grassy and woody energy crop plants |
Power generation | |
Nameplate capacity | 24.99 MW planned |
Website www.snbiopower.com |
North Negros BioPower is a planned biomass-fired power station in Manapla, Negros Occidental in the Philippines. When commissioned in the 4th quarter 2018 it will be among the biggest biomass power stations in the Philippines and will have a generating capacity of 24.99 megawatts, enough electricity to provide 265,000 people in the region’s urban centres and rural areas on the island of Negros.[1] The power plant is a cooperation between ThomasLloyd CTI Asia Holdings Pte and Bronzeoak Philippines. General Contractor is Wuxi Huaguang Electric Power Engineering.
The plant will be primary feed with cane trash with some grassy and woody energy crop plants. The feedstock utilisation will be 220,000 tonnes per year with a local feedstock availability of 2.1 million tonnes per year within a 50 km-radius catchment area. The plant will be connected to an existing 138 kV substation, 12 km away when operational. The power plant is expected to create 675 new jobs in the plant and 2,500 jobs in feedstock production and collection.[2]
The facility was initially planned to be constructed in 2014 for commissioning in 2017 with the cost of about $114 million.[3] The planned schedule for completion was moved to the third quarter of 2016.[1] The planned commissioned date was moved once again to the fourth quarter of 2018 with consturction of the facility set on the second quarter of 2017.[2]
See also
References
- 1 2 "The Philippines takes center stage at the ThomasLloyd Clean Teach Congress in Frankfurt". Embassy of the Republic of the Philippines in Germany. 3 February 2014. Retrieved 7 April 2016.
- 1 2 "North Negros Biopower". ThomasLloyd Group. Retrieved 7 April 2016.
- ↑ Valencia, Czeriza (8 October 2013). "Bioenergy developer set to complete 5 clean projects". The Philippine Star. Retrieved 7 April 2016.