Nidd Aqueduct

Nidd Aqueduct

Aqueduct carrying water from the Nidd Valley to Bradford over the River Wharfe near to Barden Bridge.
Specifications
Length 32 miles (51 km)
Status Open
History
Original owner Bradford Corporation Water Works
Principal engineer Morrison & Mason Ltd
Date completed 1899
Geography
Start point Scar House Reservoir, North Yorkshire
End point Chellow Heights water treatment plant, West Yorkshire

The Nidd Aqueduct is an aqueduct or man-made watercourse in Yorkshire, England. It feeds water from Angram and Scar House reservoirs in upper Nidderdale, North Yorkshire 32 mi (51 km)[1] to Bradford in West Yorkshire. The aqueduct supplies 21,000,000 imp gal (95,000 m3) of water per day to Chellow Heights water treatment works.[2] The aqueduct and the reservoirs it connects to are all maintained by Yorkshire Water.[3]

History

In 1892 Parliamentary Powers were granted for the City of Bradford to dam the River Nidd and its tributary Stone Beck in upper Nidderdale, and to build a conduit that delivered the water by gravity[2] to Chellow Heights in Bradford. As Bradford has no major rivers running through it, the city needed fresh water for drinking and to be able to process wool (fulling). At that time, both Nidderdale and Bradford were in the West Riding of Yorkshire.

The first reservoir (Gouthwaite)[4] was started in 1893 so that the water supply to the lower Nidd valley would not be interrupted when work on the upper dams began. In 1904 Bradford Water Works Corporation initiated the building of the next two reservoirs in the scheme in upper Nidderdale. Scar House and Angram reservoirs were constructed by James Watson and Lewis Mitchell respectively.[5] The aqueduct was constructed by Morrison & Mason Ltd.[6]

Route

The aqueduct starts on the south bank of Scar House Reservoir a few metres west of the dam. It tunnels under Rain Stang hill for 2,486 yards (2,273 m) at a depth of 484 feet (148 m), and re-appears at Armathwaite Gill.[7] There is then a short overground section across How Stean Beck before another tunnel, 1,408 yards (1,287 m) long, below Heathfield Moor. The aqueduct then tunnels below Greenhow Hill, 380 feet (120 m) below the summit, for 6,204 yards (5,673 m)[8] before re-appearing at Skyreholme, near Appletreewick.[9] It crosses the River Wharfe between Barden and Bolton Abbey, and then Barden Beck near Barden Beck Bridge. It then heads across open land again, crosses the A59 at Bolton Abbey Railway Station and runs to Chelker Reservoir above Addingham.

The aqueduct then descends into Airedale and crosses first the Leeds Liverpool Canal over Mauds Bridge in Bingley,[10] then Bingley South Bog Site of Special Scientific Interest. It passes underneath the A650 dual carriageway[11] and crosses the River Aire at Cottingley.[12] It then goes up to Chellow Heights where the water is stored.[13]

Construction

The route of the aqueduct is mostly sub-surface, apart from some small sections that drain water into the aqueduct. It was constructed from 12 miles (19 km) of cut-and-cover, 15 mi (24 km) of steel and cast-iron pipes and 6 miles (10 km) of branch feeder pipes.[1] The route is entirely fed by gravity and the use of syphons. These also pick water up from other becks and streams in Nidderdale that the aqueduct crosses.[14]

The only evidence of the aqueduct is in the various crossing bridges and syphons where the route goes across other bodies of water. Most of the exposed sections of the aqueduct have crenelated walls and towers. The bridge over the River Wharfe at Barden Beck is now used by walkers on the Dales Way.[15] A pump was installed at Barden on the River Wharfe that is capable of abstracting 5,000,000 imp gal (23,000 m3) of water a day into the Nidd Aqueduct and bolster the supply to Bradford.[16]

The section through Greenhow Hill was 3.5 mi (5.6 km) long and was completed in 1899. This was beneficial to the lead miners there as it would drain away excess water from their mineworkings.[9][17][18]

Another pipe was added alongside the original in 1920. Ten years later, the original pipe was found to be 30 inches (760 mm) out of alignment where it runs underneath Bingley South Bog. The 1920 pipe is elevated above the bog on concrete supports, but the original pipe was laid 10 feet (3.0 m) down underneath the bog surface. The pressure from the bog was forcing the pipe out of alignment and was in danger of interrupting the water supply.[19]

References

  1. 1 2 "In the steps of the bringers of city's water". Telegraph and Argus. 7 January 2008. Retrieved 10 November 2015.
  2. 1 2 "Scar House History" (PDF). Outdoored. p. 1. Retrieved 10 November 2015.
  3. "Yorkshire Water byelaws". Yorkshire Water. Retrieved 11 November 2015.
  4. "Modern Era". Upper Nidderdale Landscape Partnership. Retrieved 10 November 2015.
  5. "Scar House Dam". Engineering Timelines. Retrieved 10 November 2015.
  6. "Newsletter 76 The rise and fall of the Railways of Nidderdale". Yorkshire Archaeological Society - Industrial History Section. 2009. Retrieved 10 November 2015.
  7. Speight, Harry (1894). Nidderdale and the Garden of the Nidd. London: Eliot Stock. p. 471. Retrieved 7 December 2015.
  8. Speight, Harry (1894). Nidderdale and the Garden of the NIdd. London: Eliot Stock. p. 472. Retrieved 7 December 2015.
  9. 1 2 "Water for Bradford". Welcome to Greenhow. Retrieved 10 November 2015.
  10. "Leeds Liverpool Canal South of Bingley" (PDF). Bradford. Bradford Council. p. 55. Retrieved 10 November 2015.
  11. "A650 Bingley Relief Road -South Bog Viaduct". Transportation Research Board. TRB. 5 July 2006. Retrieved 10 November 2015.
  12. "Bridge for syphon over River Aire at Cottingley". Graces Guide to British Industrial History. Retrieved 10 November 2015.
  13. "Chellow Heights WTW Modifications for THM Removal" (PDF). Yorkshire Water. Yorkshire Water. p. 1. Retrieved 10 November 2015.
  14. Lewis, Douglas. "Quality Assurance of the Flows on the River Ouse" (PDF). Institute of Hydrology. p. 8. Retrieved 10 November 2015.
  15. "Bolton Abbey, Aqueduct Turrreted Bridge". Bolton Abbey. Retrieved 10 November 2015.
  16. "Lowdown on the reservoir village". Telegraph and Argus. 15 July 2006. Retrieved 10 November 2015.
  17. "British Association for the Advancement of Science". archive.org/stream. John Murray. p. 650. Retrieved 10 November 2015.
  18. "The Rivers Nidd and Wharfe Catchment Management Plan" (PDF). EA Lit Freshwater. Environment Agency. p. 7. Retrieved 10 November 2015.
  19. "Threat to Bradford water supply". Yorkshire Post and Leeds Intelligencer. 4 July 1930. p. 14. Retrieved 7 February 2016. (subscription required)

External links

Coordinates: 54°11′17″N 1°54′40″W / 54.18806°N 1.91111°W / 54.18806; -1.91111

This article is issued from Wikipedia - version of the 3/17/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.