Line 2, Nanchang Metro
Nanchang Metro Line 2 | |
---|---|
Overview | |
Other name(s) | Nanchang Rail Transit Line 2 |
Native name | 南昌地铁2号线 |
Type | Rail Transit |
System | Nanchang Metro |
Status | Under construction |
Locale | Nanchang, Jiangxi, China |
Termini |
Zhanqian Nan Dadao Xinjia'an |
Stations | 21 (Phase 1) |
Operation | |
Depot(s) | Nanchang West Station MPD[1] |
Rolling stock | Model-B EMU, 6 cars coupled |
Technical | |
Line length | 23.3 km (14.5 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Overhead catenary, 1500 V DC |
Operating speed | 80 km/h (50 mph) |
Nanchang Metro Line 2 (also known as Nanchang Rail Transit Line 2 in official documents) is a rail transit line under construction in Nanchang, planned to connect Jiulonghu (Chinese: 九龙湖) and Luojia Town (Chinese: 罗家镇); its Phase 1 starts at Zhanqian Nan Dadao (Chinese: 站前南大道) and ends at Xinjia'an (Chinese: 辛家庵), both termini designed for further extension. The Phase 1 is 23.3 km in length with 21 stations (including 6 transfer stations).[2] The construction of Phase 1 started in July 2013, and is expected to be operational in December 2016.[3]
Route and stations
List of stations of Nanchang Metro Line 2, Phase 1 | |||||||
---|---|---|---|---|---|---|---|
No. | Name | Chinese Name | Distance from last (m)[4] | Distance from start (km) | Platform type | Transfer | Area |
1 | Zhanqian Nan Dadao | 站前南大道 | N/A | Underground 2-storey island | N/A | Jiulonghu | |
2 | CR Nanchang West Station | 南昌西站 | 650 | Underground 2-storey island[5] | N/A | ||
3 | Longgang | 龙岗 | 1090 | Underground 2-storey island | N/A | ||
4 | International Sports Centre | 国体中心 | 1600 | Underground 2-storey island | N/A | ||
5 | Wolong Hill | 卧龙山 | 1170 | Underground 2-storey island | N/A | Hongjiaozhou | |
6 | Lingbei 3 Lu | 岭北三路 | 1300 | Underground 2-storey island | N/A | ||
7 | Qianhu Dadao | 前湖大道 | 1430 | Underground 2-storey island | N/A | ||
8 | Xuefu Dadao East | 学府大道东 | 859 | Underground 2-storey island | 5 | ||
9 | Cuiyuan Lu | 翠苑路 | 1601 | Underground 2-storey island | N/A | Honggutan | |
10 | Metro Tower | 地铁大厦 | 1384.2 | Underground 3-storey island | 1 | ||
11 | Yayuan Lu | 雅苑路 | 982.8 | Underground 2-storey island | N/A | ||
12 | Honggu Zhong Dadao | 红谷中大道 | 1173 | Underground 3-storey island | N/A | ||
13 | Yangming Park | 阳明公园 | 2638 | Underground 2-storey island | N/A | Donghu | |
14 | Qingshan Lu Crossing | 青山路口 | 979 | Underground 2-storey island | 3 | ||
15 | Fuzhou Lu | 福州路 | 603 | Underground 2-storey island | N/A | ||
16 | Bayi Square | 八一广场 | 793.74 | Underground 2-storey island | 1 | Donghu/Xihu | |
17 | Yongshu Lu | 永叔路 | 706.26 | Underground 2-storey island | N/A | Xihu | |
18 | Dinggong Lu South | 丁公路南 | 835 | Underground 2-storey island | N/A | ||
19 | CR Nanchang Station | 南昌火车站 | 995 | Underground 2-storey island | N/A | ||
20 | Hongdu Zhong Dadao | 洪都中大道 | 680 | Underground 2-storey island | 4 | Qingshanhu | |
21 | Xinjia'an | 辛家庵 | 1380 | Underground 2-storey island | N/A |
Rolling stock
Nanchang Metro Line 2 is planned to be operated with Model-B rolling stock with maximum speed of 80 km/h. 22 trains of 6 EMUs, 132 cars in total will be operated at the first stage. These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction, and minimum service interval of 2 minutes.[6]
Future development
In the initial plan of 2008, Line 2 spans from Luojia Town in the east to Wangcheng (Chinese: 望城) in the west, and is 39 km in length in the long-term plan.[7] Its Phase 1 starts from CR Nanchang West Station to Hongdu Zhong Dadao,[8] which was extended to Xinjia'an to the east in the end of 2010 and then extended further south to Jiulonghu in early 2013.[9][10]
- South extension: Phase 2 extends Line 2 from Zhanqian Nan Dadao, which is transferrable to Line 4 to Shengmi Town;
- East extension: Phase 2 extends Line 2 to Luojia town via Xinjia'an.
References
- ↑ "Nanchang Metro map". Sinaming.cn (in Chinese).
- ↑ "南昌轨道交通2号线基本情况" (in Chinese). 28 December 2011. Archived from the original on 29 October 2013.
- ↑ "南昌地铁2号线7月全线开工 卧龙山站今日正式动工". jxnews.com (in Chinese). 15 January 2013.
- ↑ "轨道交通2号线站点交通一体化规划" (in Chinese).
- ↑ "新建向塘至莆田铁路南昌西站一期配套工程(地铁与站房共建部分地铁工程)和地下出租车道工程监理招标公告" (in Chinese).
- ↑ "南昌地铁拟采用B型车 单向每小时载乘客5.5万人次". jxnews.com.cn (in Chinese). 18 November 2008.
- ↑ "南昌地铁远景规划征询民意(图)". jxnews.com.cn (in Chinese). 16 October 2008.
- ↑ "南昌地铁一期勘察招标 拟于2015年完工投运". jxnews.com.cn (in Chinese). 21 April 2009.
- ↑ "南昌地铁2号线拟南延增8站 下穿九龙湖抵达生米大道". jxcn.cn (in Chinese). 5 February 2013.
- ↑ "南昌地铁2号线拟南延至九龙湖 新增8个站点". jxnews.com.cn (in Chinese). 4 February 2013.