Mid Manair Dam
Mid Manair Dam | |
---|---|
Location of Mid Manair Dam in India Telangana | |
Official name |
మధ్య మానేరు జలాశయం Mid Manair Dam |
Location | Manwada Village, Rajanna Sircilla district, Telangana, India |
Coordinates | 18°23′34″N 78°57′40″E / 18.39278°N 78.96111°ECoordinates: 18°23′34″N 78°57′40″E / 18.39278°N 78.96111°E |
Status | Under Construction |
Construction began | 2005 |
Dam and spillways | |
Impounds | Manair River and SRSP Flood Flow Canal |
Height | 45 metres (148 ft) from river level |
Length | 388 metres (1,273 ft)[1] |
Reservoir | |
Creates | Mid Manair Reservoir |
Total capacity | 25.873 Tmcft |
Active capacity | 3.00 Tmcft |
The Mid Manair Dam (Telugu:మిడ్ మనేర్ డ్యామ్) is a major irrigation project under construction across the Manair River, at Manwada Village, Boinpalli Mandal, Rajanna Sircilla district, Telangana.
Project data
The balancing reservoir initiated is part of SRSP stage-II for which the foundation stone was laid by the former Prime Minister P. V. Narasimha Rao in 1991. The surplus water from Sriram Sagar Project flow though SRSP Flood Flow Canal (SRSP FFC) into Mid Manair Dam apart from Manair River water. Once the dam reached to full capacity, water can be released into Lower Manair Dam, a major balancing reservoir at Karimnagar city with 24Tmcft Gross Capacity.
Dam construction was started in 2004-05 as part of Jalayagnam, but was delayed due to the several political reasons. And there is huge delay in fair compensation and suitable rehabilitation to the oustees of the Mid Manair Reservoir. The oustees are Still looking for the justice from govt.
130 km long Flood Flow Canal construction work was completed till Mid Manair Dam. As Dam is under construction, the released water from Flood Flow Canal head regulator would fill Lower Manair Dam currently.
Reservoir details
Gross Capacity of 25.873 Tmcft.
Left Bank Canal 21 km to irrigate 9,500 acres.
Right Bank Canal 64 km to irrigate 90,500 acres.
Earth dam breach
On 25 September 2016, flood water flowed over the incomplete earth dam of the project and breached the earth dam inundating the downstream areas. Few villages were evacuated to save from water inundation.[2] It was planned to store 3 tmcft water in the project to facilitate water supply under SRSP (stage-II) and Kaleshwaram lift irrigation project. It is not possible to supply water from the project till the earth dam is reconstructed. The project planning and its execution is blamed for the dam breach which has not constructed the earth dam to adequate level in comparison with the adjacent concrete spill way to safely pass the normal flood water without over topping the earth dam.
Submerged Villages (16)
- Anupuram (Vemulawada)
- Arepalli (Vemulawada)
- Kodmunja (Vemulawada)
- Rudravaram (Vemulawada)
- Sankepalli (Vemulawada)
- Kodurupaka (Boinapalli)
- Manwada (Boinapalli)
- Neerojipalli (Boinapalli)
- Sabhashpalli (Boinapalli)
- Varadavelli (Boinapalli)
- Cheerlavancha (Sircilla)
- Chintalthana (Sircilla)
- Gurravanipalli (Illanthakunta)
- Kandikatkur (Illanthakunta)
- Obulapuram (Illanthakunta)
See also
References
- ↑ "India: National Register of Large Dams 2012" (PDF). Central Water Commission. Retrieved 26 August 2014.
- ↑ "Mid Manair earth dam breaches". Retrieved 26 September 2016.
- "Water released into FFC - The Hindu". thehindu.com. Retrieved 29 August 2014.
- "Brief Note on flood Flow Canal Project from S". irrigation.cgg.gov.in. Retrieved 29 August 2014.
- "Mid Manier Dam Works Starts Again | V6 News Channel Live". v6news.tv. Retrieved 29 August 2014.