Paris Métro

Paris Métropolitain

Hector Guimard's original Art Nouveau entrance of the Paris Métro in Abbesses station
Overview
Native name Métro de Paris
Owner RATP (infrastructure)
STIF (rolling stock)
Locale Paris Metropolitan Area
Transit type Rapid transit
Number of lines 16 (numbered 1–14, 3bis and 7bis)
Number of stations 303[1]
Daily ridership 4.21 million (2012)[2]
Annual ridership 1.527 billion (2013)[3]
Operation
Began operation 19 July 1900 (1900-07-19)[4]
Operator(s) RATP
Number of vehicles 700 trains
Technical
System length 214 km (133 mi)[4]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Métro signage

The Paris Metro or Métropolitain (French: Métro de Paris) is a rapid transit system in the Paris Metropolitan Area. A symbol of the city, it is noted for its density within the city limits and its uniform architecture, influenced by Art Nouveau. It is mostly underground and 214 kilometres (133 mi) long.[4] It has 303 stations,[1] of which 62 have transfers between lines.[5] There are 16 lines, numbered 1 to 14 with two lines, 3bis and 7bis, which are named because they started out as branches of lines 3 and 7; later they officially became separate lines; the Metro is still numbered as if these lines were absent. Lines are identified on maps by number and colour, and direction of travel is indicated by the terminus.

It is the second busiest subway system in Europe, after Moscow Metro, and the tenth in the world.[6] It carried 1.541 billion passengers in 2012,[2] (up from 1.524 billion in 2011), 4.210 million passengers a day. It is one of the densest metro systems in the world, with 245 stations within the 86.9 km2 (34 sq mi) of the city of Paris. Châtelet – Les Halles, with 5 Métro lines and three RER commuter rail lines, is the world's largest metro (subway) station.[7] In 2016, it has been ranked as the best public transport system in the world by the ITDP with 100 percent of people in the city of Paris having an easy access to rapid transportation, ahead of 26 other international cities (including London, New York City and Tokyo).[8]

The first line opened without ceremony on 19 July 1900,[4] during the World's Fair (Exposition Universelle). The system expanded quickly until the First World War and the core was complete by the 1920s. Extensions into suburbs and Line 11 were built in the 1930s. The network reached saturation after World War II with new trains to allow higher traffic, but further improvements have been limited by the design of the network and in particular the short distances between stations. Besides the Métro, downtown Paris and its urban area are served by the RER developed from the 1960s, several tramway lines, Transilien suburban trains and two VAL lines, serving Charles De Gaulle and Orly airports. In the late 1990s, the automated line 14 was built to relieve RER line A.

Naming

Métro is the abbreviated name of the company that originally operated most of the network: La Compagnie du chemin de fer métropolitain de Paris ("The Paris Metropolitan Railway Company"), shortened to "Le Métropolitain". That was quickly abbreviated to métro, which became a common word to designate all subway networks (or any rapid transit system) in France and in many cities elsewhere (a genericized trademark).

The Métro is operated by the Régie autonome des transports parisiens (RATP), a public transport authority that also operates part of the RER network, bus services, light rail lines and many bus routes. The name métro proved very popular and was adopted in many languages, making it the most used word for a (generally underground) urban transit system. It is possible that "Compagnie du chemin de fer métropolitain" was copied from the name of London's pioneering underground railway company, the Metropolitan Railway, which had been in business for almost 40 years prior to the inauguration of Paris's first line.

History

During the initial development of the Métro, the tracks were dug at street level in the open air and covered over later.

By 1845, Paris and the railway companies were already thinking about an urban railway system to link inner districts of the city. The railway companies and the French government wanted to extend main-line railroads into a new underground network, whereas the Parisians favoured a new and independent network and feared national takeover of any system it built.[9] The disagreement lasted from 1856 to 1890. Meanwhile, the population became more dense and traffic congestion grew massively. The deadlock put pressure on the authorities and gave the city the chance to enforce its vision.

Prior to 1845, the urban transport network consisted primarily of a large number of omnibus lines, consolidated by the French government into a regulated system with fixed and unconflicting routes and schedules.[10] The first concrete proposal for an urban rail system in Paris was put forward by civil engineer Florence de Kérizouet. This plan called for a surface cable car system.[11] In 1855, civil engineers Edouard Brame and Eugène Flachat proposed an underground freight urban railroad, due to the high rate of accidents on surface rail lines.[11] On November 19, 1871, the General Council of the Seine commissioned a team of 40 engineers to plan an urban rail network.[12] This team proposed a network with a pattern of routes "resembling a cross enclosed in a circle" with axial routes following large boulevards. On May 11, 1872, the Council endorsed the plan, but the French government turned down the plan.[12] After this point, a serious debate occurred over whether the new system should consist of elevated lines or of mostly underground lines; this debate involved numerous parties in France, including Victor Hugo, Guy de Maupassant, and the Eiffel Society of Gustave Eiffel, and continued until 1892.[13] Eventually the underground option emerged as the preferred solution because of the high cost of buying land for rights-of-way in central Paris required for elevated lines, estimated at 70,000 francs per metre of line for a 20-metre-wide railroad.[14]

The last remaining hurdle was the city's concern about national interference in its urban rail system. The city commissioned renowned engineer Jean-Baptiste Berlier, who designed Paris' postal network of pneumatic tubes, to design and plan its rail system in the early 1890s.[14] Berlier recommended a special track gauge of 1,300 mm (4 ft 3 316 in) (versus the standard gauge of 1,435 mm or 4 ft 8 12 in) to protect the system from national takeover, which inflamed the issue substantially.[15] The issue was finally settled when the Minister of Public Works begrudgedly recognized the city's right to build a local system in November 22, 1895, and by the city's secret designing of the trains and tunnels to be too narrow for main-line trains, while adopting standard gauge as a compromise with the state.[15]

Fulgence Bienvenüe project

On 20 April 1896, Paris adopted the Fulgence Bienvenüe project, which was to serve only the city proper of Paris. Many Parisians worried that extending lines to industrial suburbs would reduce the safety of the city. Paris forbade lines to the inner suburbs and, as a guarantee, Métro trains were to run on the right, as opposed to existing suburban lines, which ran on the left.

Unlike many other subway systems (such as that of London), this system was designed from the outset as a system of (initially) nine lines.[16] Such a large project required a private-public arrangement right from the outset - the city would build most of the permanent way, while a private concessionaire company would supply the trains and power stations, and lease the system (each line separately, for initially 39-year leases).[16] In July 1897, six bidders competed, and The Compagnie Generale de Traction, owned by the Belgian Baron Édouard Empain, won the contract; this company was then immediately reorganized as the Compagnie de Chemin de Fer Metropolitan.[16]

Construction began on November 1898.[17] The first line, Porte MaillotPorte de Vincennes, was inaugurated on 19 July 1900 during the Paris World's Fair. Entrances to stations were designed in art nouveau style by Hector Guimard. Eighty-six of his entrances are still in existence.

Bienvenüe's project consisted of 10 lines, which correspond to today's lines 1 to 9. Construction was so intense that by 1920, despite a few changes from schedule, most lines had been completed. The shield method of construction was rejected in favor of the cut-and-cover method in order to speed up work.[18] Bienvenüe, a highly regarded engineer, designed a special procedure of building the tunnels to allow the swift repaving of roads, and is credited with a largely swift and relatively uneventful construction through the difficult and heterogenous soils and rocks.[19]

Lines 1 and 4 were conceived as central east-west and north-south lines. Two lines, ligne 2 Nord (line 2 North) and ligne 2 Sud (line 2 South), were also planned but line 2 South was merged with line 5 in 1906.

Line 3 was an additional east-west line to the north of line 1 and line 5 an additional north-south line to the east of line 4. Line 6 would run from Nation to Place d'Italie. Lines 7, 8 and 9 would connect commercial and office districts around the Opéra to residential areas in the north-east and the south-west.

Bienvenüe also planned a circular line, the ligne circulaire intérieure, to connect the six main-line stations. A section opened in 1923 between Invalides and the Boulevard Saint-Germain before the plan was abandoned.

Nord-Sud: competing network

A Nord-Sud Sprague-Thomson train with blue 2nd class and yellow 1st class cars
Main article: Nord-Sud Company

On 31 January 1904, a second concession was granted to the Société du chemin de fer électrique souterrain Nord-Sud de Paris (Paris North-South underground electrical railway company), abbreviated to the Nord-Sud (North-South) company. It was responsible for building three proposed lines:

Line A was inaugurated on 4 November 1910, after being postponed because of floods in January of that year. Line B was inaugurated on 26 February 1911. Because of the high construction costs, the construction of line C was postponed. Nord-Sud and CMP used compatible trains that could be used on both networks, but CMP trains used 600 volts third rail, and NS −600 volts overhead wire and +600 volts third rail. This was necessary because of steep gradients on NS lines. NS distinguished itself from its competitor with the high-quality decoration of its stations, the trains' extreme comfort and pretty lighting.

Nord-Sud did not become profitable and bankruptcy became unavoidable. By the end of 1930, the CMP bought Nord-Sud. Line A became line 12 and line B line 13. Line C was built and renamed line 14, that line was reorganized in 1937 with lines 8 and 10. This partial line is now the south part of line 13.

The last Nord-Sud train set was decommissioned on 15 May 1972.[20]

1930–1950: first inner suburbs are reached

Anatole France station on line 3, inaugurated in 1937 in the inner suburb of Levallois-Perret

Bienvenüe's project was nearly completed during the 1920s. Paris planned three new lines and extensions of most lines to the inner suburbs, despite the reluctance of Parisians. Bienvenüe's inner circular line having been abandoned, the already-built portion between Duroc and Odéon for the creation of a new east-west line that became line 10, extended west to Porte de Saint-Cloud and the inner suburbs of Boulogne.

The line C planned by Nord-Sud between Montparnasse station and Porte de Vanves was built as line 14 (different from present line 14). It extended north in encompassing the already-built portion between Invalides and Duroc, initially planned as part of the inner circular.

The over-busy Belleville funicular tramway would be replaced by a new line, line 11, extended to Châtelet. Lines 10, 11 and 14 were thus the three new lines envisaged under this plan.

Most lines would be extended to the inner suburbs. The first to leave the city proper was line 9, extended in 1934 to Boulogne-Billancourt; more followed in the 1930s. World War II forced authorities to abandon projects such as the extension of lines 4 or 12 to the northern suburbs. By 1949, eight lines had been extended: line 1 to Neuilly and Vincennes, line 3 to Levallois-Perret, line 5 to Pantin, line 7 to Ivry, line 8 to Charenton, line 9 to Boulogne-Billancourt, line 11 to Les Lilas and line 12 to Issy-les-Moulineaux.

World War II had a massive impact on the Métro. Services were limited and many stations closed. The risk of bombing meant the service between Place d'Italie and Étoile was transferred from line 5 to line 6, so that most of the elevated portions of the Métro would be on line 6. As a result, lines 2 and 6 now form a circle. Most stations were too shallow to be used as bomb shelters. The French Resistance used the tunnels to conduct swift assaults throughout Paris.[21]

It took a long time to recover after liberation in 1944. Many stations had not reopened by the 1960s and some closed for good. On 23 March 1948, the CMP (the underground) and the STCRP (bus and tramways) merged to form the RATP, which still operates the Métro.

1960–1990: development of the RER

Charles de Gaulle – Étoile station on the RER A, inaugurated in 1970

The network grew saturated during the 1950s. Outdated technology limited the number of trains, which led the RATP to stop extending lines and concentrate on modernisation. The MP 51 prototype was built, testing both rubber-tyred metro and basic automatic driving on the voie navette. The first replacements of the older Sprague trains began with experimental articulated trains and then with mainstream rubber-tyred metro MP 55 and MP 59, some of the latter still in service (line 4 and 11). Thanks to newer trains and better signalling, trains ran more frequently.

The population boomed from 1950 to 1980. Cars became more popular and suburbs grew further from the city. The main railway stations, termini of the suburban rail lines, were overcrowded during rush hour. The short distance between metro stations slowed the network and made it unprofitable to build extensions.

The solution in the 1960s was to revive a project abandoned at the end of the 19th century: joining suburban lines to new underground portions in the city centre as the réseau express régional (regional express network) (RER).

Metro escalators

The RER plan initially included one east-west line and two north-south lines. RATP bought two unprofitable SNCF lines—the Ligne de Saint-Germain (westbound) and the Ligne de Vincennes (eastbound) with the intention of joining them and to serve multiple districts of central Paris with new underground stations. The new line created by this merger became line A. The Ligne de Sceaux, which served the southern suburbs and was bought by the CMP in the 1930s, would be extended north to merge with a line of the SNCF and reach the new Paris-Charles de Gaulle Airport in Roissy. This became line B. These new lines were inaugurated in 1977 and their wild success outperformed all the most optimistic forecasts to the extent that line A is the most used urban rail line in the world with nearly 300 million journeys a year.

Because of the enormous cost of these two lines, the third planned line was abandoned and the authorities decided that later developments of the RER network would be more cheaply developed by SNCF, alongside its continued management of other suburban lines. However, the RER developed by SNCF would never match the success of the RATP's two RER lines. In 1979, SNCF developed line C by joining the suburban lines of Gare d'Austerlitz and Gare d'Orsay, the latter being converted into a museum dedicated to impressionist paintings. During the 1980s, it developed line D, which was the second line planned by the initial RER schedule, but serving Châtelet instead of République to reduce costs. A huge Métro-RER hub was created at Châtelet-Les Halles, the world's largest underground station.

The same project of the 1960s also decided to merge lines 13 and 14 to create a quick connection between Saint-Lazare and Montparnasse as a new north-south line. Distances between stations on the lengthened line 13 differ from that on other lines in order to make it more "express" and hence to extend it farther in the suburbs. The new Line 13 was inaugurated on 9 November 1976.

1990–2010: Eole and Météor

Châtelet station on line 14, inaugurated in 1998

In October 1998, Line 14 was inaugurated. It was the first fully new Métro line in 63 years. Known during its conception as Météor (Métro Est-Ouest Rapide), it is one of the two fully automatic lines within the network along with Line 1. It was the first with platform screen doors to prevent suicides and accidents.

It was conceived with extensions to the suburbs in mind, similar to the extensions of the line 13 built during the 1970s. As a result, most of the stations are at least a kilometre apart. Like the RER lines designed by the RATP, nearly all stations offer connections with multiple Métro lines. The line runs between Saint-Lazare and Olympiades.

Lines 7 and 13 are the only two on the network to be split in branches. The RATP would like to get rid of those saturated branches in order to improve the network's efficiency. A project existed to attribute to line 14 one branch of each line, and to extend them further into the suburbs. This project was abandoned.

In 1999, the RER line E was inaugurated. Known during its conception as Eole (Est-Ouest Liaison Express), it is the fifth RER line. It terminates at Haussmann – Saint-Lazare, but a new project, financed by EPAD, the public authority managing the La Défense business district, should extend it west to La Défense – Grande Arche and the suburbs beyond.

2010 and beyond: Automation and extensions to the suburbs

In November 2011, the line 1 was converted to driverless operation. The line was operated with driver operated trains and driverless trains until the full delivery of the driverless MP 05 trains in February 2013.
Following the line 1, the same operation is expected for line 4.

Several extensions to the suburbs have opened in the last years.
Line 8 has been extended to Pointe du Lac in 2011, line 12 extended to Aubervilliers in 2012 and line 4 extended to Mairie de Montrouge in 2013.

Accidents and incidents

Network

Since the Métro was built to comprehensively serve the city inside its walls, the stations are very close: 548 metres apart on average, from 424 m on line 4[22] to one kilometre on the newer line 14, meaning Paris is densely networked with stations.[23] The surrounding suburbs are served by later line extensions, thus traffic from one suburb to another must pass through the city. The slow average speed effectively prohibits service to the greater Paris area.

The Métro is mostly underground (197 km of 214 km). Above-ground sections consist of viaducts within Paris (on lines 1, 2, 5 & 6) and the suburban ends of lines 1, 5, 8, and 13. The tunnels are relatively close to the surface due to the variable nature of the terrain, which complicates deep digging; exceptions include parts of line 12 under the hill of Montmartre and line 2 under Ménilmontant. The tunnels follow the twisting lie of the streets. During construction in 1900 a minimum radius of curvature of 75 metres was imposed, though this low standard was not adhered to at Bastille and Notre-Dame-de-Lorette.

Like the New York City Subway and in contrast with the London Underground the Paris Métro mostly uses two-way tunnels. As in most French métro and tramway systems, trains drive on the right (the SNCF drives on the left). The tracks are standard gauge (1.435 metres). Electric power is supplied by a third rail which carries 750 volts DC.

The width of the carriages, 2.4 metres, is narrower than that of newer French systems (such as the 2.9 m carriages in Lyon, one of the widest in Europe)[24][25] and trains on lines 1, 4 and 14 have capacities of 600-700 passengers; this is as compared with 2,600 on the Altéo MI 2N trains of RER A. The size of the Metro tunnels was deliberately chosen by the City of Paris to prevent the running of main-line trains; the city of Paris and the nation of France had historically poor relations.[16] In contrast to many other historical metro systems (such as New York, Madrid, London, and Boston), all lines have tunnels and operate trains with the same dimensions. Five lines (1, 4, 6, 11 and 14) run on a rubber tire system developed by the RATP in the 1950s, exported to the Montreal, Santiago and Mexico City metros.

The number of cars in each train varies line by line from three to six; most have five, and eight is possible on line 14. Two lines, 7 and 13, have branches at the end, and trains serve every station on each line except when they are closed for renovations.

Opening hours

The first train leaves each terminus at 05:30: on some lines additional trains start from an intermediate station. The last train, often called the "balai" (broom) because it sweeps up remaining passengers, arrives at the terminus at 01:15, except on Fridays (since 7 December 2007[26]), Saturdays and on nights before a holiday, when the service ends at 02:15.

On New Year's Eve, Fête de la Musique, Nuit Blanche and other events, some stations on lines 1, 4, 6, 9 and 14 remain open all night.

Tickets

Paris old standard carnet ticket "t".
Paris Visite pass (as of December 2012).

Fares are sold at kiosks and at automated machines in the station foyer. Entrance to platforms is by automated gate, opened by smart cards and simple tickets. Gates return tickets for passengers to retain for the duration of the journey. There is normally no system to collect or check tickets at the end of the journey, and tickets can be inspected at any point. The exit from all stations is clearly marked as to the point beyond which possession of a ticket is no longer required.

Automated machine at Paris Métro with French, English and German.

The standard ticket is ticket "t+". It is valid for a multi-transfer journey within one and a half hours from the first validation. It can be used on the Métro, buses and trams, and in zone 1 of the RER. It allows unlimited transfers between the same mode of transport (i.e. Métro to Métro, bus to bus and tram to tram), between bus and tram, and between metro and RER zone 1. When transferring between the Metro and the RER, it is necessary to retain the ticket. The RER requires a valid ticket for entry and exit, even for a transfer. It costs €1.80 or ten (a carnet) for €14.10.[27]

Other fares use the Navigo pass, an RFID-based contactless smart card. Fares include:

Facilities

On June 26, 2012, it was announced that the Métro would get Wi-Fi in most stations. Access provided is free, with a premium paid alternative offer proposed for a faster internet connection.[29]

Technical specifications

The Métro has 214 kilometres (133 mi) of track[4] and 303 stations,[1] 62 connecting between lines.[5] These figures do not include the RER network. The average distance between stations is 562 m (1,844 ft). Trains stop at all stations.[30] Lines do not share tracks, even at interchange (transfer) stations.[25]

Trains average 20 km/h (12.4 mph) with a maximum of 70 km/h (43 mph) on all but the automated driverless trains of line 14, which average 40 km/h (25 mph) and reach 80 km/h (50 mph). An average interstation trip takes 58 seconds. Trains travel on the right. The track is standard gauge but the loading gauge is smaller than the mainline SNCF network. Power is from a lateral third rail, 750 V DC, except on the rubber-tyred lines where the current is from guide bars.[25]

The loading gauge is small compared to those of newer metro systems (but comparable to that of early European metros), with capacities of between about 560 and 720 passengers per train on Lines 1–14. Many other metro systems (such as those of New York and London) adopted expanded tunnel dimensions for their newer lines (or used tunnels of multiple sizes almost from the outset, in the case of Boston), at the cost of operating incompatible fleets of rolling stock. Paris built all lines to the same dimensions as its original lines. Before the introduction of rubber-tire lines in the 1950s, this common shared size theoretically allowed any Metro rolling stock to operate on any line, but in practice each line was assigned a regular roster of trains.

A feature is the use of rubber-tired trains on five lines: this technique was developed by RATP and entered service in 1951.[31] The technology was exported to many networks around the world (including Montreal, Mexico City, and Santiago). Lines 1, 4, 6, 11 and 14 have special adaptations to accommodate rubber-tyred trains. Trains are composed of 3 to 6 cars depending on the line, the most common being 5 cars (line 14 may have 8 cars in the future), but all trains on the same line have the same number of cars.

The Metro is designed to provide local, point-to-point service in Paris proper and service into the city from some close suburbs. Stations within Paris are very close together to form a grid structure, ensuring that every point in the city is close to a metro station (less than 500 metres or 1,600 feet), but this makes the service slow 20 km/h (12 mph), except on Line 14 where the stations are farther apart and the trains travel faster. The low speed virtually precludes feasible service to farther suburbs, which are serviced by the RER.

The metro is mostly underground; surface sections include sections on viaduct in Paris (lines 1, 2, 5 and 6) and at the surface in the suburbs (lines 1, 5, 8 and 13). In most cases both tracks are laid in a single tunnel. Almost all lines follow roads, having been built by the cut-and-cover method near the surface (the earliest by hand). Line 1 follows the straight course of the Champs-Elysées and on other lines some stations (for example, Commerce) have platforms that do not align: the street above is too narrow to fit both platforms opposite each other. Many lines have very sharp curves. The specifications established in 1900 required a very low minimum curve radius by railway standards, but even this was often not fully respected, for example near Bastille and Notre Dame de Lorette. Parts of the network are built at depth, in particular a section of line 12 under Montmartre, the sections under the Seine, and all of line 14.

Lines 7 and 13 have two terminal branches.

Rolling stock

The rolling stock has steel-wheel ("MF" for matériel fer) and rubber-tyred trains ("MP", matériel pneu). The different versions of each kind are specified by year of design.

Lines

Paris Métro lines
Line name Opened Last
extension
Stations
served
Length Average
interstation
Journeys made
(per annum)
Termini
Paris Métro Line 1 Line 1 1900 1992 25 16.6 km / 10.3 miles 692 m 213,921,408 La Défense
Château de Vincennes
Paris Métro Line 2 Line 2 1900 1903 25 12.3 km / 7.7 miles 513 m 95,945,503 Porte Dauphine
Nation
Paris Métro Line 3 Line 3 1904 1971 25 11.7 km / 7.3 miles 488 m 91,655,659 Pont de Levallois
Gallieni
Paris Métro Line 3bis Line 3bis 1971 1971 4 1.3 km / 0.8 miles 433 m Porte des Lilas
Gambetta
Paris Métro Line 4 Line 4 1908 2013 27 12.1 km / 6.6 miles 424 m 155,348,608 Porte de Clignancourt
Mairie de Montrouge
Paris Métro Line 5 Line 5 1906 1985 22 14.6 km / 9.1 miles 695 m 92,778,870 Bobigny
Place d'Italie
Paris Métro Line 6 Line 6 1909 1942 28 13.6 km / 8.5 miles 504 m 104,102,370 Charles de Gaulle - Étoile
Nation
Paris Métro Line 7 Line 7 1910 1987 38 22.4 km / 13.9 miles 605 m 121,341,833 La Courneuve
Villejuif
Mairie d'Ivry
Paris Métro Line 7bis Line 7bis 1967 1967 8 3.1 km / 1.9 miles 443 m Louis Blanc
Pré Saint-Gervais
Paris Métro Line 8 Line 8 1913 2011 38 23.4 km / 13.8 miles 614 m 92,041,135 Balard
Pointe du Lac
Paris Métro Line 9 Line 9 1922 1937 37 19.6 km / 12.2 miles 544 m 119,885,878 Pont de Sèvres
Mairie de Montreuil
Paris Métro Line 10 Line 10 1923 1981 23 11.7 km / 7.3 miles 532 m 40,411,341 Boulogne
Gare d'Austerlitz
Paris Métro Line 11 Line 11 1935 1937 13 6.3 km / 3.9 miles 525 m 46,854,797 Châtelet
Mairie des Lilas
Paris Métro Line 12 Line 12 1910[32] 2012 29 13.9 km / 8.6 miles 515 m 81,409,421 Front Populaire
Mairie d'Issy
Paris Métro Line 13 Line 13 1911[32] 2008 32 24.3 km / 15.0 miles 776 m 114,821,166 Châtillon - Montrouge
Saint-Denis
Les Courtilles
Paris Métro Line 14 Line 14 1998 2007 9 9 km / 5.6 miles 1,129 m 62,469,502 Saint-Lazare
Olympiades

Stations

The typical station comprises two central tracks flanked by two 4‑m-wide platforms. About 50 stations, generally current or former termini, are exceptions; most have three tracks and two platforms (Porte d'Orléans), or two tracks and a central platform (Porte Dauphine). Some stations are single-track, either due to difficult terrain (Saint-Georges), a narrow street above (Liège) or track loops (Église d'Auteuil).

Station length was originally 75 m. This was extended to 90 m on high-traffic lines (1 and 4), with some stations at 105 m (the difference as yet unused).

In general, stations were built near the surface by the cut-and-cover method, and are vaulted. Stations of the former Nord-Sud network (lines 12 and 13) have higher ceilings, due to the former presence of a ceiling catenary. There are exceptions to the rule of near-surface vaulting:

Several ghost stations are no longer served by trains. One of the three platforms at Porte des Lilas station is on a currently unused section of track, and is often used as a backdrop in films.

Interior decoration

Entrance to a Metra commuter rail station in Chicago, designed in Art Nouveau style as a replica of a Paris Métro station

Concourses are decorated in Art Nouveau style defined at the Métro's opening in 1900. The spirit of this aesthetic has generally been respected in renovations.

Standard vaulted stations are lined by small white earthenware tiles, chosen because of the poor efficiency of early twentieth century electric lighting. From the outset walls have been used for advertising; posters in early stations are framed by coloured tiles with the name of the original operator (CMP or Nord Sud). Stations of the former Nord Sud (most of line 12 and parts of line 13) generally have more meticulous decoration. Station names are usually inscribed on metallic plaques in white letters on a blue background or in white tiles on a background of blue tiles.

The first renovations took place after the Second World War, when the installation of fluorescent lighting revealed the poor state of the original tiling. Three main styles of redecoration followed in succession.

A number of stations have original decorations to reflect the cultural significance of their locations. The first to receive this treatment was Louvre – Rivoli on line 1, which contains copies of the masterpieces on display at the museum. Other notable examples include Bastille (line 1), Saint-Germain-des-Prés (line 4), Cluny – La Sorbonne (line 10) and Arts et Métiers (line 11).

Exterior decoration

The original Art Nouveau entrances are iconic symbols of Paris, and 83 survive. Designed by Hector Guimard in a style that caused some surprise and controversy in 1900, there are two main variants:

Later stations and redecorations have brought increasingly simple styles to entrances.

A handful of entrances have original architecture (Saint-Lazare), and a number are integrated into residential or standalone buildings (Pelleport).

Future

Under construction

Three extensions are being built.

Line 4 is being extended southward 3.2 km from Porte d'Orléans to Bagneux with two intermediate stations. Mairie de Montrouge opened in March 2013 and the further extension to Bagneux is due to open in 2019.[33][34]

Line 12 had a new station at Front Populaire opened in 2012. It will be followed by a further extension to Mairie d’Aubervilliers, which is due to open in 2019.[35][36]

Line 14 is being extended towards Mairie de Saint-Ouen with a projected opening in 2019.[37][38]

Plans

There are a lot of projects that are going to be built between 2019 and 2030 :

The line 15, the biggest new line, is a circular line around Paris. It will open in 2022. The line 17 will go to Roissy Airport by 2023. The two others lines will serve the suburban area of Paris.

There have also been proposals for:

Cultural significance

The Métro has a cultural significance that goes well beyond the city of Paris. The name Métropolitan (or Métro) has become a generic name for subways and urban underground railroads.

The station entrance kiosks, designed by Hector Guimard, fostered the Art Nouveau building style (once widely known as "le style Métro"),[39] though, some French commentators criticized the Guimard station kiosks, including their green color and sign lettering, as difficult to read.[40]

The success of rubber-tired lines led to their export to metro systems around the world, starting with the Montreal Metro.[41] The success of Montreal "did much to accelerate the international subway boom" of the 1960s/1970s and "assure the preeminence of the French in the process.[42] Rubber-tired systems were adopted in Mexico City, Santiago, Lausanne, Turin, Singapore and other cities. The Japanese adopted rubber-tired metros (with their own technology and manufacturing firms) to systems in Kobe, Sapporo, and parts of Tokyo.

See also

References

Notes

  1. 1 2 3 "The Network - The Metro: a Parisian institution". RATP. Retrieved 2014-01-29.
  2. 1 2 "Activity Report 2012" (pdf). STIF. p. 20. Retrieved 2014-03-21.
  3. STIF Annual report
  4. 1 2 3 4 5 "Brief history of the Paris metro". france.fr - The official website of France. Retrieved 2013-09-21.
  5. 1 2 Statistiques Syndicat des transports d'Île-de-France rapport 2005 (in French) states 297 stations + Olympiades + Les Agnettes + Les Courtilles Archived 17 June 2012 at the Wayback Machine.
  6. Archived 15 February 2010 at the Wayback Machine.
  7. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p135
  8. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p138-140
  9. 1 2 Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p141
  10. 1 2 Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p142
  11. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p142-148
  12. 1 2 Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p148
  13. 1 2 Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p148-9
  14. 1 2 3 4 Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p149
  15. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p149.
  16. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p151
  17. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p150-1,162
  18. "1968–1983 : le RER et la modernisation du réseau parisien" [1968–1983: The RER and the modernisation of the parisian network]. Musée des Transports – Histoire du Métropolitain de Paris (in French). Retrieved 6 February 2011.
  19. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p286
  20. Jean Tricoire, Un siècle de métro en 14 lignes, p. 188
  21. Jean Tricoire, op. cit., p. 330
  22. Jean Tricoire. Un siècle de métro en 14 lignes. De Bienvenüe à Météor.
  23. 1 2 3 Clive Lamming, Métro insolite
  24. Press statement from RATP 2 October 2007 Archived 27 March 2009 at the Wayback Machine.
  25. "Accueil – Ticket "t"". Ratp.info. Retrieved 20 April 2011.
  26. "Accueil –Ticket jeune". RATP. Retrieved 20 April 2011.
  27. Le Wi-Fi gratuit arrive dans le métro parisien
  28. On 1 January 2006, a test was done with few lines opening at night on main stops only.
  29. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p312
  30. 1 2 Lines 12 and 13 were originally built as part of the Nord-Sud network (as lines A and B respectively).
  31. Paris Métro Line 4#Future
  32. http://extension-reseau.ratp.fr/m4/index.html (in French)
  33. Paris Métro Line 12#Future
  34. http://www.leparisien.fr/seine-saint-denis-93/aubervilliers-le-prolongement-de-la-ligne-12-du-metro-egalement-retarde-de-2-ans-23-10-2014-4236219.php (in French)
  35. Paris Métro Line 14#Future
  36. http://www.leparisien.fr/transports/projets/grand-paris-le-prolongement-de-la-ligne-14-du-metro-retarde-a-mi-2019-23-10-2014-4236029.php (in French)
  37. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p155, 165
  38. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p155-6, 165
  39. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p318-9
  40. Bobrick, Benson. Labyrinths of Iron: A History of the World's Subways. New York: Newsweek Books, 1981. p319

Bibliography

  • Bindi, A., & Lefeuvre, D. (1990). Le Métro de Paris : Histoire d'hier à demain, Rennes : Ouest-France. ISBN 2-7373-0204-8. (French)
  • Descouturelle, Frédéric, et al. (2003). Le métropolitain d'Hector Guimard. Somogy. ISBN 2-85056-815-5. (French)
  • Gaillard, M. (1991). Du Madeleine-Bastille à Météor : Histoire des transports Parisiens, Amiens : Martelle. ISBN 2-87890-013-8. (French)
  • Hovey, Tamara. Paris Underground, New York: Orchard Books, 1991. ISBN 0-531-05931-6.
  • Lamming, C.(2001) Métro insolite, Paris : Parigramme, ISBN 2-84096-190-3.
  • Ovenden, Mark. Paris Metro Style in map and station design, London: Capital Transport, 2008. ISBN 978-1-85414-322-8.
Wikimedia Commons has media related to Paris Metro.
This article is issued from Wikipedia - version of the 11/27/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.