Liverpool Cruise Terminal

Coordinates: 53°24′26″N 3°00′00″W / 53.4073°N 3.0001°W / 53.4073; -3.0001

Liverpool Cruise Terminal

The Liverpool Cruise Terminal is a 350-metre-long (1,150 ft) floating structure situated on the River Mersey enabling large cruise ships to visit without entering the enclosed dock system or berthing mid-river and tendering passengers ashore. The terminal was officially opened on 21 September 2007 by HRH The Duke of Kent when the Queen Elizabeth 2 berthed at the terminal.[1]

Facilities

The £19 million facility is capable of accommodating vessels of 345 metres (1,132 ft) in length and 10 metres (33 ft) draft.[2] The terminal was mostly funded by grants of £9 million from the UK government and £8.6 million from the European Regional Development Fund.[3][4]

The cruise terminal was developed in conjunction with improvements to the Isle of Man ferry terminal, operated by the Isle of Man Steam Packet Company. The Royal Navy also berths ships at the terminal several times a year, often allowing the public to visit the ships.[5][6]

Turnaround status

The Cunard Building is the cruise check-in terminal building.
Queen Mary 2 at the Liverpool Cruise Terminal

The £9.2 million grant[7] from the UK government came with the strange condition that the terminal could only be used for cruise port-of-calls, which meant cruises would not be allowed to begin or end at the terminal. "Turnaround" visits generate more revenue for the port and city than port-of-calls. The reason for the strange restriction was that it was to minimize unfair competition with other ports that had been built with private funding, particularly Southampton.[3] Liverpool City Council tried unsuccessfully to have this restriction removed in 2009.[8] In July 2011, the council offered to pay back part of the UK government funding in exchange for being allowed turnaround visits, which led Associated British Ports, the owner of Southampton Docks, to take legal advice.[9] The Southampton Chamber of Commerce collected 12,000 signatures on a petition against the change.[10] Liverpool city council did cite that £70 million of public money was spent in upgrading the rail link from Southampton Docks to the Midlands container terminals competing directly with the Port of Liverpool. This fell on deaf ears.[11] However, in March 2012, the government agreed a repayment offer from Liverpool Council and construction of a temporary terminal buildings began on the shore and floating terminal landing stage.[12]

On Tuesday, 29 May 2012 a cruise began from the Pier Head for the first time in 40 years, when Ocean Countess[13] departed on a cruise to the Norwegian fjords.[14] From 2014 Liverpool will be the home port of Thomson Spirit, which will operate cruises out of Liverpool.[15]

Future

The cruise terminal is part of the £5.5 billion Liverpool Waters scheme to regenerate 60 hectares of dockland in Liverpool. The terminal received UK Government approval in March 2013, after Liverpool City Council approved the scheme in March 2012.[16][17]

A second Cruise terminal is planned as a part of the Liverpool Waters scheme.[18]

Gallery

References

  1. QE2 stars in liner terminal opening, Liverpool Daily Post, 18 September 2008, retrieved 6 April 2008
  2. Cruise Traffic, Peel Ports, 13 October 2010, retrieved 13 October 2010
  3. 1 2 "Liverpool settle Pier Head cruise terminal row". BBC. 2012-02-03. Retrieved 2012-07-19.
  4. "Liverpool cruise liner terminal plans threatened". BBC. 2011-11-11. Retrieved 2012-07-19.
  5. "HMS Liverpool makes final voyage to River Mersey". BBC. 2012-02-29. Retrieved 2012-07-19.
  6. "HMS Dragon open to public in Liverpool during visit". BBC. 2012-04-29. Retrieved 2012-07-19.
  7. "Cruise terminal grant repaid". Southport Reporter. 2012-10-11. Retrieved 2012-10-11.
  8. "MP calls for cruise ports enquiry". BBC News. 2009-11-01. Retrieved 2012-07-19.
  9. "Liverpool bids to change city cruise restrictions". BBC. 2011-07-11. Retrieved 2012-07-19.
  10. "Southampton objects to Liverpool cruise terminal plan". BBC. 2011-09-15. Retrieved 2012-07-19.
  11. "Southampton to Midlands £70m rail route revamp complete". BBC News. 2011-04-04.
  12. "Liverpool cruise terminal building begins". BBC. 2012-03-22. Retrieved 2012-07-19.
  13. "A new era is a turnaround for Liverpool!". Southport Reporter. 2012-05-24. Retrieved 2012-05-24.
  14. "First cruise liner since 1972 leaves Liverpool". BBC. 2012-05-29. Retrieved 2012-07-19.
  15. http://sailawaysblog.wordpress.com/2013/03/
  16. "Liverpool Waters plan approved despite World Heritage threat". BBC. 2012-03-06. Retrieved 2012-07-19.
  17. http://www.liverpoolwaters.co.uk/content/news.php?id=2130
  18. http://www.liverpoolwaters.co.uk/content/home.php

External links

This article is issued from Wikipedia - version of the 9/28/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.