Hanging Bridge at Chekaguda, Rayagada
Hanging Bridge at Chekaguda, Rayagada | |
---|---|
Coordinates | 19°10′02″N 83°25′51″E / 19.1671096°N 83.4307276°ECoordinates: 19°10′02″N 83°25′51″E / 19.1671096°N 83.4307276°E |
Carries | pedestrians, bicycles, motorbikes |
Crosses | Nagavali River |
Locale | Chekaguda village, Rayagada, Odisha, India |
Characteristics | |
Design | simple suspension bridge |
Material | rope |
Total length | 151 metres (495 ft) |
Height | 30.48 metres (100.0 ft) |
Load limit | 8 pedestrians |
Clearance below | 33 metres (108 ft)[1] |
History | |
Designer | Girish Bhardwaj |
Constructed by | Bharat Grama Sethu Pratisthan |
Construction begin | Nov 2011 |
Construction end | Mar 2012 |
Construction cost | ₹15 million (US$220,000)[2] |
Opened | 2012 (current bridge) |
Hanging Bridge at Chekaguda is Odisha's second hanging bridge[3] near Rayagada in Orissa, India over the Nagavali River. The bridge links the town of Rayagada to the villages of Mariguda, Chakaguda etc. The bridge is mainly a medium of communication as well as a tourist attraction.[4] The bridge is open all the year round (subject to weather) and people may cross it without a fee.
History
Designed by Karnataka-based 'Bharat Grama Sethu Pratisthana' Chief Girish Bhardwaj, the project was entrusted to Odisha Police Housing Corporation[5][6] by the District Administration. The estimated cost of the bridge is 1.5 Crores under the Integrated Action Plan (IAP) for the Maoist-prone areas. Villagers of eight Panchayats had been making a detour via Kolnara, 25 km from the area to reach the nearby town Rayagada.[7][8][9] Three years back the villagers, with the help of SHG made a bamboo bridge to solve the problem of communication. They would now need to travel just 5 km to reach Rayagada.[10]
Features
It spans 151 metres (495 ft) and is 30.48 metres (100.0 ft) above the rocks below.[11][12] The area is attractive with natural beauty. The only other bridge is at Dhabaleswar. There is no precedence of this kind of a bridge being constructed by the District Administration in Orissa.[13] The project was taken up in December 2011 and the skilled workers worked overtime to complete it in a record time of just 3 months.
Geography
Getting to the place is not difficult. Nearest airport is at Visakhapatnam (Andhra Pradesh). It is located at Lat 19° 10′ 02″ N and Lon. 83° 25′ 58″ E.
References
- ↑ "Suspension bridge to be ready soon". The Hindu. 5 Mar 2012.
- ↑ Arabinda K Padhee (3 Jan 2012). "Tour Diary of IAS Director" (PDF). http://odishapanchayat.gov.in/. Government of Odisha. External link in
|website=
(help) - ↑ "District Portal of Rayagada district"
- ↑ "Newodisha"
- ↑ "ÖPHWC"
- ↑ "2.imimg" Tender Notice
- ↑ "Newindianexpress"
- ↑ "Koraputonline"
- ↑ "Indiablooms"
- ↑ "thehindu"
- ↑ "Odishadiary" Odisha's second suspension bridge
- ↑ "IBNLIVE"
- ↑ "eodisha"