Cardinal Greenway

The Cardinal Greenway is a rail trail that encompasses 60 miles (97 km) of abandoned CSX railroad corridor in east central Indiana. The trail runs from Richmond to Marion and is the longest rails-to-trails project in Indiana[1] as of 2004. The Cardinal Greenway was designated a National Recreation Trail in June 2003[2] and is an important part of the American Discovery Trail.[3]

Cardinal Greenway – Wysor Street Depot in Muncie

Name

Cardinal Greenway takes its name from the last passenger train to regularly travel the route (Chicago-Cincinnati-Washington): the Cardinal.[1] The train service in turn derived its name from the state bird of all five states which it traversed.

Sponsor

The trail is managed by Cardinal Greenway, Inc., formerly known as Delaware Greenways, Inc. The company is organized under federal tax regulations as a 501(c)(3) not-for-profit organization.[4] Its mission statement is as follows:

Cardinal Greenway, Inc. is dedicated to enhancing the quality of life by developing and operating corridors and trails to connect people and communities.[5]

History

In 1993, over 200 people responded to a small newspaper item saying there would be a meeting to investigate the possibility of purchasing an abandoned rail line for a rails-to-trails conversion project.[2] (Rail removal had begun on said line in Fall of 1992. Work started in Marion and was completed from there through Richmond by June 1993.) Cardinal Greenway, Inc., a not-for-profit, was formed, and it purchased 60 miles (97 km) of the former railroad corridor from CSX Corporation in that same year (1993).[1][6] In 1996 a Master Plan was completed and final tracings were submitted to INDOT.

Groundbreaking took place in September 1997, marking the start of Phase 1, a 10-mile (16 km) Muncie section from the Wysor Street Depot to County Road 534 East. The 8-mile (13 km) Jonesboro-Marion section and the 2.5-mile (4.0 km) Richmond section were constructed sometime before 2003.[7] The 10-mile (16 km) Muncie-Gaston section was constructed around 2003.

On Thursday, June 5, 2003, the Cardinal Greenway was designated a National Recreation Trail.[2][8]

The 7-mile (11 km) Losantville-Mt. Pleasant section was opened in a ribbon-cutting ceremony held in Losantville on April 19, 2007. Governor Mitch Daniels helped cut the ribbon.[9][10]

On Tuesday, May 20, 2008 Governor Mitch Daniels announced[11] grants which include[12] work on the Richmond-to-Losantville section (improving six bridges, among other work) and the Sweetser Switch Trail Connector (connecting the two trails along an abandoned railroad corridor).

Route

The trail starts in Richmond, travels through Wayne, Randolph, Henry, Delaware, and Grant counties, and ends in Marion.

The trail is paved with asphalt.[5]

Richmond Section

The trail begins with a 2.5 miles (4.0 km) section on the north side of Richmond. This is near the Whitewater River.

Planned Richmond-Muncie Construction

The Richmond section and the Muncie section planned to be joined in the future. The total of the lengths of the Richmond section, the new section, and the Muncie section will be “around 52 miles (84 km)”.[13]

The constructed link will go through Losantville.

Planned Richmond-Losantville Construction

This planned route, 20.6 miles (33.2 km) from Industries Road to Losantville,[14] will go under I-70 and through the town of Economy.[15]

This is the curviest segment of the former railroad corridor.[16]

Losantville-Mt. Pleasant Construction

This 7-mile (11 km) section (2 miles (3.2 km) in Randolph County, 3½ miles in Henry County, and 1½ miles in Delaware County) will go through Blountsville and will probably parallel U.S. Route 35 most of the way.[10]

Trailheads

(Mt. Pleasant-) Muncie (-Gaston) Section

This is the longest completed section, offering 20 miles (32 km) of paved trail with trailheads, rest areas, and interpretive signage.[6] All rest areas and trail heads are handicapped accessible.

This section picks up the trail at the intersection of S 534 E and E 700 S, southeast of the Prairie Creek Reservoir. This area has 10 miles (16 km) of adjacent horse trail.[13]

The Cardinal Greenway then travels into the heart of Muncie, bisecting with Wysor Street Depot in the middle. Just to the north of the depot the Cardinal Greenway intersects the White River Greenway.

The trail continues out of Muncie to Gaston. It is about 10 miles (16 km) from the depot to the trailhead in Gaston.

Trailheads

Gaston-Jonesboro Gap

An 11.3-mile (18.2 km) section of the former rail corridor, going from Gaston to Jonesboro and running through Fowlerton, is owned by private land owners. Cardinal Greenways, Inc. states that a route “will be chosen using public roads to connect the two sections of Cardinal Greenway.”[6] IndianaTrails.org states that “[t]he county road route can be followed using Dan Henry-style pavement markers.”[19]

Gaston-Jonesboro County Road Route

The route connects around the gap by following 17.2 miles (27.7 km)[20] of county roads. From the Gaston trailhead, it continues

where the greenway resumes (at the first left after Boyd Street).

(Jonesboro-) Marion Section

This section of the route is 8 miles (13 km) in length.[19][21]

The trail resumes in Jonesboro at East 10th Street. From there it travels along the Mississinewa River until it crosses US-35/IN-22. By East 4th Street in Jonesboro, there is a pedestrian bridge over the Mississinewa to the Eugene “Beaner” Linn Park, a 90-acre (360,000 m2)[22] park in Gas City.

After crossing US-35/IN-22, the trail goes on into Marion, going by Hogin Park,[23][24] through the short tunnel under South D Street, under “the bypass” (IN-9), and ending at South Miller Avenue.

Trailheads

Beyond Marion

Plans were announced on October 16, 2007 to expand the Cardinal Greenway 3 miles (4.8 km) west to the Sweetser Switch Trail[26][27] in Sweetser, and perhaps eventually to Converse in Miami County.

Connections With Other Trails

The Cardinal Greenway is part of the Northern Route of the American Discovery Trail.[3]

The Cardinal Greenway connects to the White River Greenway just north of the Wysor Street Depot near downtown Muncie. Current expansion is underway to construct a larger White River Greenway trail along Wheeling Road north of downtown Muncie.

In Richmond, the trail connects to the Whitewater Gorge Trail and Gennett Walk of Fame in the Whitewater Gorge Park.

Map

The map included here show Delaware County and surrounding areas. For more complete maps of the entire length of the trail visit the Indiana Trails site.

See also

References

  1. 1 2 3 American Trails Cardinal Greenway article
  2. 1 2 3 National Recreation Trail Database entry
  3. 1 2 American Discovery Trail: Ohio State Line to Marion, Indiana Archived September 8, 2008, at the Wayback Machine.
  4. Sponsorship Archived August 8, 2007, at the Wayback Machine.
  5. 1 2 Cardinal Greenway, Inc. homepage
  6. 1 2 3 Cardinal Greenway, Inc. Trail History
  7. Indiana Rail Trails as of July 18, 2002
  8. NPS Director Announces 23 National Recreation Trail Designations in 12 States
  9. "Archived copy". Archived from the original on June 14, 2011. Retrieved 2008-07-11.
  10. 1 2 U.S. DOI NPS NCRC Conservation Successes July 2007 (bottom of page 1, top of page 2)
  11. $19 Million Investment for New Indiana Trails (Office of the Governor press release)
  12. 2008 State Trail Grants Archived June 19, 2008, at the Wayback Machine. (see top of page 4 and top of page 7)
  13. 1 2 3 4 5 IndianaTrails.org: Cardinal Greenway – Muncie Archived February 9, 2007, at the Wayback Machine.
  14. the Spring 2008 Newsletter of Cardinal Greenways, Inc.
  15. Greenways & Trails – Lehman & Lehman – Portfolio Archived March 14, 2007, at the Wayback Machine.
  16. a March 8, 2008 post on Nathan Bilger's indianarailroads.org
  17. Cardinal Greenway Inc.: Equestrian Trail Archived October 25, 2008, at the Wayback Machine.
  18. Cardinal Greenway Trail
  19. 1 2 IndianaTrails.org: Cardinal Greenway – Marion Archived February 20, 2008, at the Wayback Machine.
  20. West Elm Street, Gaston to East 10th Street, Jonesboro – Google Maps
  21. Maps & Facts Archived July 5, 2008, at the Wayback Machine.
  22. Parks in Gas City and Jonesboro Archived July 3, 2008, at the Wayback Machine. – Gas City Area Chamber of Commerce
  23. http://web.archive.org/web/20070206150211/http://www.jamesdeancountry.com/Trails.php#maincontent
  24. http://www.marionindiana.us/maps/Park%20Map%202006.pdf[]
  25. 1 2 http://www.marionindiana.us/maps/Cardinal%20Greenway.pdf[]
  26. "Archived copy" (PDF). Archived from the original (PDF) on May 9, 2008. Retrieved 2008-03-08.
  27. Sweetser Switch Trail Archived March 2, 2008, at the Wayback Machine.

Coordinates: 40°33′28″N 85°41′35″W / 40.557659°N 85.69305°W / 40.557659; -85.69305

External links

This article is issued from Wikipedia - version of the 12/1/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.