Amaravati seed capital road

Amaravati seed capital road
Route information
Length: 21 km (13 mi)
Major junctions
West end: Dondapadu
East end: Kanakadurga Varadhi junction (National Highway 16)

Amaravati seed capital road is a proposed access road in the Andhra Pradesh Capital Region of India for connecting Amaravati.[1] It is being built by the APCRDA and will have a total length of 21 km (13 mi) and the total estimated cost is 2.3 billion (US$34 million).[2][3]

Phase–I

The proposed phase–I of the road will be constructed for a length of 18.3 km (11.4 mi) between Dondapadu–near Kondaveetivagu by the end of 2018.[4]

References

  1. "Four-lane road to Andhra Pradesh new capital soon". Deccan Chronicle. 6 August 2015. Retrieved 29 June 2016.
  2. "High-speed road to Amaravati". Deccan Chronicle. 26 June 2016. Retrieved 29 June 2016.
  3. "AP government clips wings of CRDA - Times of India". The Times of India. 14 April 2016. Retrieved 29 June 2016.
  4. "CM allots first lot of plots in Amaravati". The Hindu. 26 June 2016. Retrieved 29 June 2016.
This article is issued from Wikipedia - version of the 11/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.